Argon Piping Supply, Installation and Testing

Key dates

Posted
Jul 17, 2026
Response deadline
Jul 27, 2026, 11:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
No Set aside used
Set-aside code
NONE
PSC
Y1JZ

NAICS

Issuing office

Department
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Office code
089.8900.899034
Organization type
OFFICE
Office address
Batavia, IL, 60510, USA

Place of performance

Street
Street 2
City
Lead
State
South Dakota
Zip
57754
Country
UNITED STATES

Contacts

Description

July 17, 2026 - Amendment 2 is issued to proviide additional questions and answers to this RFP. Documents are attached. The Proposal due date is unchanged, proposals are due on 27 July 26. July 8, 2026 - Amendment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attached link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.

Attachments (19)

  • 📎 RFP+Argon+Piping+R1+6.1.2026.docx
    application/octet-stream · 93 KB
    Download
  • 📎 J-10+South+Dakota+Wase+Determinatin+20260016.txt
    application/octet-stream · 13 KB
    Download
  • 📎 J-2+2025+INSURANCE+REQUIREMENTS+FOR+FRA+SUBCONTRACTED+WORK+AT+SURF+Risk+category+3+%28Rev+01.pdf
    application/pdf · 314 KB
    Download
  • 📎 K-4+FL-57B+%28Rev.+1-07%29.pdf
    application/pdf · 22 KB
    Download
  • 📎 Amend+02+to+RFP+LBNF-735735-JK.pdf
    application/pdf · 115 KB
    Download
  • 📎 K-3+FL-11_Rev1.pdf
    application/pdf · 332 KB
    Download
  • 📎 J-7+014100-8-2025-South+Dakota+Quality+Requirements.pdf
    application/pdf · 331 KB
    Download
  • 📎 J-4+SDSTA+Risk+Transfer+Protocol+Manual+Final+July+12+2024.pdf
    application/pdf · 3.4 MB
    Download
  • 📎 J-5+010010_General_Requirements_SD_4_2025_FFDG.docx
    application/octet-stream · 97 KB
    Download
  • 📎 J-3+Argon+Piping+Supply+and+Install+SOW+%282%29.docx
    application/octet-stream · 4.2 MB
    Download
  • 📎 J-1+FFDG+General+Terms+and+Conditions+for+Construction+at+SURF+%2808.2025%29.pdf
    application/pdf · 327 KB
    Download
  • 📎 K-2+SARC_Subcontractor+Annual+RepsCerts+Rev+4.pdf
    application/pdf · 362 KB
    Download
  • 📎 J-9+FL-55+Small+Business+Subcontracting+Plan+%28Rev.+6-23%29+14.0+-+Exhibit+III-G.pdf
    application/pdf · 392 KB
    Download
  • 📎 1.+RFP+Letter+6.1.2026+R1.docx
    application/octet-stream · 49 KB
    Download
  • 📎 K-1+PUR-466_Proposal+Certifications-.pdf
    application/pdf · 402 KB
    Download
  • 📎 J-6+013100_7-31-2025+FermiForward_South_Dakota.pdf
    application/pdf · 1.3 MB
    Download
  • 📎 J-11+Price+Sheet+including+Fully+Burdened+Hourly+Rate.xlsx
    application/octet-stream · 13 KB
    Download
  • 📎 Copy+of+2026.07.10+-+Questions+%232+-+U2623.xlsx
    application/octet-stream · 28 KB
    Download
  • 📎 J-6.1+7010_F1_Fermilab+Subcontractor+Safety+Information+Questionnaire.docx
    application/octet-stream · 42 KB
    Download

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
142c48620ba64615a2328803ff507fa2
Full path
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.FERMILAB - DOE CONTRACTOR
Office code
089.8900.899034
Ingested
Jul 18, 2026
Updated
Jul 20, 2026