SolicitationActive6982AF27B000003
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
TRANSPORTATION, DEPARTMENT OF / FEDERAL HIGHWAY ADMINISTRATION / 6982AF CENTRAL FEDERAL LANDS DIVISIKey dates?
- Posted?
- Nov 3, 2026
- Response deadline?
- Nov 12, 2026, 9:00 PM UTC
- Archive date?
- Dec 12, 2026
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- Y1LB
NAICS?
Issuing office?
- Department?
- TRANSPORTATION, DEPARTMENT OF
- Sub-tier?
- FEDERAL HIGHWAY ADMINISTRATION
- Office?
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Office code?
- 069.6925.6982AF
- Organization type?
- OFFICE
- Office address?
- LAKEWOOD, CO, 80228, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Tishomingo
- State?
- Oklahoma
- Zip?
- 73460
- Country?
- UNITED STATES
Contacts?
- Eric Grosskreuzprimary
- Jorey Demlsecondary
Description?
PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD
Attachments (7)?
- Download📎 11-3-26+QnA+OK+FW+TSM+10%281%29.pdfapplication/pdf · 138 KB
- Download📎 QnA+OK+FW+TSM+10%281%29.pdfapplication/pdf · 80 KB
- Download📎 OK+TSM+10%281%29+-+Plans.pdfapplication/pdf · 31.1 MB
- Download📎 A001.pdfapplication/pdf · 3.6 MB
- Download📎 Design+Physical+Data+and+Reports.zipapplication/octet-stream · 157 KB
- Download📎 FP-24+Standard+Specifications+for+Construction+FHWA+Federal+Hwy+Projects.pdfapplication/pdf · 5.7 MB
- Download📎 OK+FW+TSM+10%281%29+IFB+6982AF27B000003.pdfapplication/pdf · 4.0 MB
Other notices in this solicitation?
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsNov 10, 2026LATEST
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsNov 10, 2026LATEST
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsNov 10, 2026LATEST
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsNov 5, 2026LATEST
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsOct 28, 2026
- SolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsOct 6, 2026LATEST
- PresolicitationOK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsAug 24, 2026
Similar open contracts
Metadata?
- Notice ID?
- bc3fb5608115489b969d5f80fcf5cbb0
- Full path?
- TRANSPORTATION, DEPARTMENT OF.FEDERAL HIGHWAY ADMINISTRATION.6982AF CENTRAL FEDERAL LANDS DIVISI
- Office code?
- 069.6925.6982AF
- Ingested?
- Nov 4, 2026
- Updated?
- Nov 11, 2026