SolicitationActive1333MJ26Q0077
Barrow Observatory Flooring Replacement
COMMERCE, DEPARTMENT OF / NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION / DEPT OF COMMERCE NOAAKey dates?
- Posted?
- Sep 18, 2026
- Response deadline?
- Sep 24, 2026, 7:00 PM UTC
- Archive date?
- Oct 9, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- Z2JZ
NAICS?
Issuing office?
- Department?
- COMMERCE, DEPARTMENT OF
- Sub-tier?
- NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Office?
- DEPT OF COMMERCE NOAA
- Office code?
- 013.1330.1333MJ
- Organization type?
- OFFICE
- Office address?
- KANSAS CITY, MO, 64106, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Barrow
- State?
- Alaska
- Zip?
- 99723
- Country?
- UNITED STATES
Contacts?
- Moore, Darrinprimary
Description?
Replacement of flooring at the NOAA Barrow Observatory in Utqia?vik, AK. Read the attached solicitation for details. Wage Determination AK20260001 added through Amendment 1. Attachment 5 - Bathroom Dimensions added through Amendment 2. Bathroom dimensions are approximately 12'x7'. Summary of the damage: Under Building: A cracked p trap in the floor drain was the cause. The P trap primer dripped into the cracked trap for an unknown amount of time. The vapor barrier on the bottom of the building held the water from the trap primer and allowed it to spread to an area of at least 8’x12’, under the building but probably more. Likely not more than 20'x20'. When removed the insulation in this area was soaked and frozen about 1.5” up from the bottom. When the soffits were opened to inspect the issue it was discovered that the flooding extended into the bays beyond where the P trap repair was to be made. Plumbing repairs were made to the p trap. Inside Building: The ?” subfloor is warped around the toilet and floor drain from flooding, sheet vinyl flooring is uneven. 1 ? subfloor is good. Vinyl sheets are about 12’x6’, warping is right on the seam of the vinyl sheets. Warping has improved as things have dried and the room has been used, but slight deflection is noticable in bathroom vinyl.
Attachments (6)?
- Download📎 Sol_1333MJ26Q0077.pdfapplication/pdf · 331 KB
- Download📎 Attachment+3+-+GML+Banned+Materials+List+-+Sept+2024.pdfapplication/pdf · 612 KB
- Download📎 Attachment+1+-+Statement+of+Work.pdfapplication/pdf · 116 KB
- Download📎 Attachment+2+-+Photos.pdfapplication/pdf · 10.8 MB
- Download📎 Attachment+4+-+Wage+Determination+AK20260001.pdfapplication/pdf · 91 KB
- Download📎 Attachment+5+-+Bathroom+Dimensions.pdfapplication/pdf · 1.3 MB
Other notices in this solicitation?
- SolicitationBarrow Observatory Flooring ReplacementSep 15, 2026LATEST
- SolicitationBarrow Observatory Flooring ReplacementSep 14, 2026
Similar open contracts
Metadata?
- Notice ID?
- bbdc4b59634d4d45bd3d667cb7961245
- Full path?
- COMMERCE, DEPARTMENT OF.NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION.DEPT OF COMMERCE NOAA
- Office code?
- 013.1330.1333MJ
- Ingested?
- Sep 19, 2026
- Updated?
- Sep 29, 2026