This notice has been superseded. See the latest notice: Rosebud Lift Station Construction (Solicitation)

Rosebud Lift Station Construction

Key dates

Posted
Jun 16, 2026
Response deadline
Jul 20, 2026, 9:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Y1ND

NAICS

Issuing office

Department
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Sub-tier
INDIAN HEALTH SERVICE
Office
DIV OF ENGINEERING SVCS - SEATTLE
Office code
Organization type
OFFICE
Office address
SEATTLE, WA, 98121, USA

Place of performance

Street
Street 2
City
Rosebud
State
SD
Zip
57570
Country
USA

Contacts

Description

Request For Proposals (RFP) Rosebud Lift Station Construction 75H70126R00030 Set-Aside: Total Small Business set-aside. Product Service Code: Y1ND - Construction of Sewage And Waste Facilities NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction Size Stdr: $45 million Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd POP: 240 calendar days Construction Magnitude: Between $500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See Section H.50. Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system. Primary Point of Contact: Daniel Cotto Email: daniel.cotto@ihs.gov Phone Number: 2404617841 Alternative Point of Contact: (Please don't add unless the primary is unavailable.) Andrew E. Hart Email: andrew.hart@ihs.gov Phone Number: 206-375-4443 Attachments: Refer to the Attachments section.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
b17419d07e244c78a664f6c24f03d5bb
Full path
HEALTH AND HUMAN SERVICES, DEPARTMENT OF.INDIAN HEALTH SERVICE.DIV OF ENGINEERING SVCS - SEATTLE
Office code
Ingested
Jun 17, 2026
Updated
Jul 11, 2026