GovBidAlerts
← All opportunities

36C24726Q0802 Amendment 0001

Key dates

Posted
Sep 2, 2026
Response deadline
Sep 8, 2026, 4:00 PM UTC
Archive date
Sep 23, 2026
Archive type
auto15

Classification

Notice type
Special Notice
Base type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Set-aside code
SBA
PSC
N075

NAICS

Issuing office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
247-NETWORK CONTRACT OFFICE 7 (36C247)
Office code
036.3600.36C247
Organization type
OFFICE
Office address
AUGUSTA, GA, 30904, USA

Place of performance

Street
—
Street 2
—
City
—
State
Alabama
Zip
36083
Country
UNITED STATES

Contacts

Description

Questions and Answers The purpose of this amendment is provide answers to the additional questions received after the question period. The due date for offers is extended until September 08, 2026, at 12:00PM EST. **Offerors must acknowledge receipt of Amendment 0001 with their offers** Q1: Does the soundboard need to be analog or digital? A1: Digital Q2: If digital, how many faders are required? A2: 24 faders Q3: How many watts per channel on the Crown amplifiers? A3: 650W @ 8 Ohms Q4: How many channels per amplifier? A4: 2 Q5: How many HDMI outputs on the HDMI Splitter? A5: 4 Q6: The Description of Need lists an audio inserter but that is not in the requirements, please specify if an audio inserter is required. A6: Combining the audio feed from the sound board with the video feed from the camera is a requirement Q7: The Description of Need lists a digital camera, is the contractor to provide a camera? A7: Yes Q8: The Description of Need lists a HDMI switcher but that is not in the requirements, please specify if an HDMI switcher is required and if so how many inputs and outputs. A8: It is required. The switcher needs to support a minimum of 4 input channels Q9: The description of Need lists microphones but none are listed in the requirements, are microphones to be reused or is the contractor to quote microphones? A9: The existing microphones will be reused Q10: If microphones are requested to be provided, please specify how many, wired or wireless, and what type of wireless (i.e. handheld, lavalier, or head worn) A10: Not required Q11: If so, please specify if it needs to be a Pan-Tilt-Zoom (PTZ) camera or a professional/handheld camera? A11: PTZ Q12: If the customer requests a PTZ camera, do they want a control system to control the camera, HDMI switching, and audio from a wireless touch panel? A12: The camera needs to be controlled with a handheld remote Q13: If a control system is requested would the customer prefer to control volume from an iPad instead of a physical soundboard? A13: Control from a physical soundboard Q14: Is fiber distribution already in place for all rooms that the Fiber Command is to tie into? A14: No. Fiber optic cables will need to be installed to each Samsung television. Q15: If not please specify how many rooms and approximate distances required. A15: All monitors will be placed in the same room. Approximate distance is 75. Q16: Is the snake to be analog or digital? A16: Analog Q17: If analog, how long does the snake need to be? A17: Approximately 25' Q18: How is the snake to be ran? (i.e. in conduit, through basement, surface mount, through the ceiling) A18: Surface mount Q19: If digital, is there a CAT line already in place for use? A19: NA Q20: If cables need ran in the ceiling how high is the ceiling? A20: 30' Q21: Is it open rafters? A21: Yes Q22: Can we get a lift or scaffolding in to run cables or would a ladder work? A22: It is an open vaulted ceiling approximately Q23: Is the Fractal Audio AXE-FX III to be utilized for a guitar or as a digital signal processor? A23: It is to be utilized for 2 guitars and a base guitar and needs to be fully configured as part of the project. Q24: Is the contractor to provide mounts for the TVs or will those also be purchased by the customer? A24: Mounts should be provided by contractor Q25: How high are the TVs to be hung and on what type of wall? A25: One wall is cinder block and the other is sheetrock. Q26: If the contractor is to provide the TV mounts are they required to be full motion mounts? A26: Flat mounts are fine. Q27: Please provide a list of existing equipment that is to be reused. A27: The only existing equipment to be reused is the 4 existing microphones.

Attachments (9)

  • 📎 IMG_0102.jpeg
    application/octet-stream · 3.0 MB
    Download
  • 📎 IMG_0100.jpeg
    application/octet-stream · 2.7 MB
    Download
  • 📎 IMG_0105.jpeg
    application/octet-stream · 2.6 MB
    Download
  • 📎 Chapel+Drawings.pdf
    application/pdf · 21 KB
    Download
  • 📎 IMG_0097.jpeg
    application/octet-stream · 2.7 MB
    Download
  • 📎 IMG_0106.jpeg
    application/octet-stream · 2.6 MB
    Download
  • 📎 IMG_0101.jpeg
    application/octet-stream · 3.0 MB
    Download
  • 📎 IMG_0098.jpeg
    application/octet-stream · 3.2 MB
    Download
  • 📎 IMG_0104.jpeg
    application/octet-stream · 3.2 MB
    Download

Similar open contracts

Metadata

Notice ID
aeb93c34cc044c27b93b5b93cc1c8251
Full path
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.247-NETWORK CONTRACT OFFICE 7 (36C247)
Office code
036.3600.36C247
Ingested
Sep 3, 2026
Updated
Sep 13, 2026