GovBidAlerts
← All opportunities

CJAG Power Distribution

Key dates

Posted
Sep 8, 2026
Response deadline
Sep 22, 2026, 2:00 AM UTC
Archive date
Oct 6, 2026
Archive type
auto15

Classification

Notice type
Combined Synopsis/Solicitation
Base type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Set-aside code
SBA
PSC
Y1PZ

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W7NU USPFO ACTIVITY OH ARNG
Office code
021.2100.NGB.JFHQ USPFO OH.USPFO OH PROC.W91364
Organization type
OFFICE
Office address
COLUMBUS, OH, 43235-2712, USA

Place of performance

Street
—
Street 2
—
City
Ravenna
State
Ohio
Zip
44266
Country
UNITED STATES

Contacts

Description

The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System. The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center. The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables. Site Visits are encouraged, call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580. Do not contact these individuals for any reason other than coordinating site visit.

Attachments (2)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
a47748d034204b7db3ec68b8ed1d0271
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W7NU USPFO ACTIVITY OH ARNG
Office code
021.2100.NGB.JFHQ USPFO OH.USPFO OH PROC.W91364
Ingested
Sep 9, 2026
Updated
Sep 13, 2026