GovBidAlerts
← All opportunities
This notice has been superseded. See the latest notice: Trail Hardening MUT, Lake Loop Section (Solicitation)

Trail Hardening MUT, Lake Loop Section

Key dates

Posted
Mar 16, 2026
Response deadline
Apr 17, 2026, 9:00 PM UTC
Archive date
May 2, 2026
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Z1PA

NAICS

Issuing office

Department
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
Southwestern Regional Office, Region 3
Office code
Organization type
OFFICE
Office address
ALBUQUERQUE, NM, 87102, USA

Place of performance

Street
Street 2
City
New Waverly
State
TX
Zip
77358
Country
USA

Contacts

Description

1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and supervision to complete the project. 2. The contractor shall be responsible to verify the necessary quantities of materials to be supplied. It is suggested that the contractor visit the project site prior to turning in a proposal. 3. There are no utilities available at the project site. 4. All work shall be done in accordance with this document, the project plans, and the FP- 14. 5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to be incorporated into the work shall be removed daily. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds’Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
9c3959e4511a4657a046080c495ca7d7
Full path
AGRICULTURE, DEPARTMENT OF.FOREST SERVICE.Southwestern Regional Office, Region 3
Office code
Ingested
May 2, 2026
Updated
May 2, 2026