Upper Baker Installing Trailer Pads and Utilities

Key dates

Posted
Jul 7, 2026
Response deadline
Aug 10, 2026, 11:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Combined Synopsis/Solicitation
Base type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
S119

NAICS

Issuing office

Department
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
Manti-Lasal National Forest
Office code
012.12C2.128472
Organization type
OFFICE
Office address
PRICE, UT, 84501, USA

Place of performance

Street
Street 2
City
Monticello
State
Utah
Zip
84535
Country
UNITED STATES

Contacts

Description

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Attachments (9)

  • 📎 C04+SOW+1240LT26Q0126.docx
    application/octet-stream · 19 KB
    Download
  • 📎 C04+trailer+pad+1240LT26Q0126.pdf
    application/pdf · 814 KB
    Download
  • 📎 C04+SF-1442+1240LT26Q0126.pdf
    application/pdf · 100 KB
    Download
  • 📎 C04+water+details+1240LT26Q0126.pdf
    application/pdf · 545 KB
    Download
  • 📎 C04+Utility+Plan+1240LT26Q0126.pdf
    application/pdf · 256 KB
    Download
  • 📎 C04+Merged+Specs+1240LT26Q0126.docx
    application/octet-stream · 146 KB
    Download
  • 📎 C04+1240LT26Q0126.docx
    application/octet-stream · 93 KB
    Download
  • 📎 C04+WD+San+Juan+County+Utah+1240LT26Q0126.pdf
    application/pdf · 62 KB
    Download
  • 📎 C04+Project+Map+1240LT26Q0126.pdf
    application/pdf · 64 KB
    Download

Similar open contracts

Metadata

Notice ID
951967d44bd44757925a825597357cf3
Full path
AGRICULTURE, DEPARTMENT OF.FOREST SERVICE.Manti-Lasal National Forest
Office code
012.12C2.128472
Ingested
Jul 8, 2026
Updated
Jul 11, 2026