OpenSolicitationFederal
AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)
Department of Defense · Department of the Air Force
Due Closes in 8 daysRef. FA2396-27-9CTBD
At a glance
- What
This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a.
Industry: Commercial and Institutional Building Construction (NAICS 236220)
- Who can bid
- Any business — no set-aside listed
- Where
- OH
- Key dates
- Posted: Nov 23, 2026
- Deadline: Fri, Dec 4, 2026 · 11:59 PM EST (closes in 8 days)
- How to respond
Megan L Rosenbeck · megan.rosenbeck@us.af.mil
Submit per the instructions on SAM.gov ↗
- Documents
- 4 attachments ↓
Description
This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria. To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio.
Read more ↓Show less ↑
This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures. Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.
Documents (4)
- Download📎 Bombers+Heritage+Hall+PWS+-+13+Nov+26.docxapplication/octet-stream · 198 KB
- Download📎 Bombers+Heritage+Hall+diagram.pptxapplication/octet-stream · 148 KB
- Download📎 2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdfapplication/pdf · 134 KB
- Download📎 AOI+Final+OT+Bombers.pdfapplication/pdf · 173 KB
All notice detailsShow ↓
- Solicitation number
- FA2396-27-9CTBD
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- Product/service code (PSC)
- Z1JZ
- Department
- Department of Defense
- Sub-agency
- Department of the Air Force
- Contracting office
- FA8652 AFRL HQ AFRL/PK
- Office location
- WRIGHT PATTERSON AFB, OH, 45433-7132
- Place of performance
- Ohio, 45432, UNITED STATES
- Archive date
- Dec 19, 2026
- Archive type
- auto15
- Set-aside code
- NONE
- Office code
- 057.5700.AFMC.AFRL.FA8652
- Organization type
- OFFICE
- Full agency path
- DEPT OF DEFENSE.DEPT OF THE AIR FORCE.FA8652 AFRL HQ AFRL/PK
- SAM.gov notice ID
- 772b6b465acf4e8b9c17cf74ac4c50a7
Industry (NAICS)
Contacts
- Megan L Rosenbeck · primarymegan.rosenbeck@us.af.mil(awards)
- Jay D Solether · secondaryjay.solether@us.af.mil(awards)
Closes in 8 days🔔 Get alerts for bids like this