Y1DA--630A4-26-401 MRI AHU Modification

Key dates

Posted
Jul 23, 2026
Response deadline
Aug 7, 2026, 7:00 PM UTC
Archive date
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Set-aside code
PSC
Y1DA

NAICS

Issuing office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Office code
036.3600.36C242
Organization type
OFFICE
Office address
ALBANY, NY, 12208, USA

Place of performance

Street
Street 2
City
State
Zip
Country

Contacts

Description

36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification 6. Per our teams meeting this morning, please see below RFI's; There are 3 potential options for the MRI chiller: Air cooled package at grade with glycol and pump package. Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water. Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only. Does The VA have a preference for which system works better for them? The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice? There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load? COR answer(s): It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications. Accordingly, a series pump configuration is not considered an acceptable design. The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.

Attachments (20)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
74bdad0f41934d01984710a36c9fa92c
Full path
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.242-NETWORK CONTRACT OFFICE 02 (36C242)
Office code
036.3600.36C242
Ingested
Jul 24, 2026
Updated
Jul 24, 2026