SolicitationActive36C24226R0060
Y1DA--630A4-26-401 MRI AHU Modification
VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 242-NETWORK CONTRACT OFFICE 02 (36C242)Key dates?
- Posted?
- Jul 23, 2026
- Response deadline?
- Aug 7, 2026, 7:00 PM UTC
- Archive date?
- —
- Archive type?
- autocustom
Classification?
- Notice type?
- Solicitation
- Base type?
- Solicitation
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- Y1DA
NAICS?
Issuing office?
- Department?
- VETERANS AFFAIRS, DEPARTMENT OF
- Sub-tier?
- VETERANS AFFAIRS, DEPARTMENT OF
- Office?
- 242-NETWORK CONTRACT OFFICE 02 (36C242)
- Office code?
- 036.3600.36C242
- Organization type?
- OFFICE
- Office address?
- ALBANY, NY, 12208, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- —
- Zip?
- —
- Country?
- —
Contacts?
- Kimberly A Gomez (Contractor)primaryContract Specialist
Description?
36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification 6. Per our teams meeting this morning, please see below RFI's; There are 3 potential options for the MRI chiller: Air cooled package at grade with glycol and pump package. Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water. Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only. Does The VA have a preference for which system works better for them? The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice? There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load? COR answer(s): It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications. Accordingly, a series pump configuration is not considered an acceptable design. The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.
Attachments (20)?
- Download📎 S02+INSTRUCTIONS+TO+BIDDERS+REGARDING+TAX+EXEMPTION+IN+NY+2.1.docxapplication/octet-stream · 18 KB
- Download📎 S02+FAR+DEVIATION+FEB+2025+NOTICE+2.1.docxapplication/octet-stream · 15 KB
- Download📎 S02+SAFETY+AND+ENVIRONMENTAL+RECORD+2.1.docxapplication/octet-stream · 16 KB
- Download📎 P02+Drawings.pdfapplication/pdf · 3.0 MB
- Download📎 36C24226R0060+0001.docxapplication/octet-stream · 19 KB
- Download📎 S02+AUTODESK+Contractors+Access+Instructions+1.1.pdfapplication/pdf · 1.1 MB
- Download📎 S02+LIMITATION+ON+SUBCONTRACTING+2.1.docxapplication/octet-stream · 16 KB
- Download📎 SOW+12152025.docxapplication/octet-stream · 39 KB
- Download📎 36C24226R0060_1.docxapplication/octet-stream · 124 KB
- Download📎 36C24226R0060+0002.docxapplication/octet-stream · 19 KB
- Download📎 S02+Privacy+Training+for+Personnel+without+Access+to+VA+Computer+1.1.pdfapplication/pdf · 62 KB
- Download📎 S02+Participation+Goals+for+Minorities+and+Females+2.1.pdfapplication/pdf · 414 KB
- Download📎 SCA+2015_4187_34+12032025.docxapplication/octet-stream · 7.8 MB
- Download📎 Phase+II+Proposals.docxapplication/octet-stream · 22 KB
- Download📎 S02+Specifications.pdfapplication/pdf · 607 KB
- Download📎 S02+Supplement+A+though+C.pdfapplication/pdf · 616 KB
- Download📎 S02+52.225-2+BUY+AMERICAN+CERTIFICATE+2.1.docxapplication/octet-stream · 16 KB
- Download📎 36C24226R0060+0003.docxapplication/octet-stream · 19 KB
- Download📎 WD+NY20260003+01302026.docxapplication/octet-stream · 5.5 MB
- Download📎 Instructions+to+Offers.docxapplication/octet-stream · 352 KB
Other notices in this solicitation?
- SolicitationY1DA--630A4-26-401 MRI AHU ModificationJul 23, 2026LATEST
- SolicitationY1DA--630A4-26-401 MRI AHU ModificationJun 30, 2026
- SolicitationY1DA--630A4-26-401 MRI AHU ModificationJun 30, 2026
- SolicitationY1DA--630A4-26-401 MRI AHU ModificationJun 18, 2026
- Award NoticeY1DZ--NRM-CONST 630-26-200 NYH Repair Underground Storage TanksMay 20, 2026
- SolicitationY1DA--630A4-26-401 MRI AHU ModificationApr 27, 2026
- PresolicitationY1DA--630A4-26-401 MRI AHU ModificationApr 7, 2026
Similar open contracts
Metadata?
- Notice ID?
- 74bdad0f41934d01984710a36c9fa92c
- Full path?
- VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.242-NETWORK CONTRACT OFFICE 02 (36C242)
- Office code?
- 036.3600.36C242
- Ingested?
- Jul 24, 2026
- Updated?
- Jul 24, 2026