Sources SoughtActiveSLAC_FEH_Optics_Lab_Construction_RFP_366145
SLAC FEH Optics Lab Construction Project
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / SLAC Natl Accel Lab -DOE ContractorKey dates?
- Posted?
- Jun 25, 2026
- Response deadline?
- Jul 2, 2026, 12:00 AM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Sources Sought
- Base type?
- Sources Sought
- Set-aside?
- —
- Set-aside code?
- —
- PSC?
- —
NAICS?
Issuing office?
- Department?
- ENERGY, DEPARTMENT OF
- Sub-tier?
- ENERGY, DEPARTMENT OF
- Office?
- SLAC Natl Accel Lab -DOE Contractor
- Office code?
- 089.8900.899040
- Organization type?
- OFFICE
- Office address?
- Menlo Park, CA, 94025, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Menlo Park
- State?
- California
- Zip?
- 94025
- Country?
- UNITED STATES
Contacts?
- Matt Mezzettaprimary
Description?
THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist. SLAC FEH Optics Lab Construction – Design-Bid-Build SCOPE The FEH Optics Lab Project will be delivered through a firm-fixed-price contract. The base scope includes demolition, new architectural (framing, doors, ceiling, flooring, CSF wall), new power distribution, new light fixtures, new HVAC system, new process piping (with insulation inside the room), controls, leak detection system, fire protection system, cable trays, etc. See construction documents for details. The Subcontractor shall provide all construction services necessary to deliver this project's scope. The Subcontractor shall emphasize cost-effectiveness throughout the project while maintaining high-quality standards and meeting contract requirements. The Subcontractor shall attend weekly OAC meetings throughout the duration of the work and provide progress updates, scheduling information, and address any issues relevant to the scope. The Subcontractor shall provide electrical demolition plan as part of SLAC electrical readiness review process. MINIMUM QUALIFICATIONS The Offeror’s General Contractor’s license has not been revoked within the past five (5) years. The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts. Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract. Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default. The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities SOURCES SOUGHT RESPONSE Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information: Firm’s name Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses Please provide your response to Matt Mezzetta at mezzetta@slac.stanford.edu by 5 pm PST on July 1st, 2026. SOURCES SOUGHT DISCLAIMER: Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Attachments (26)?
- Download📎 DRAFT_B2_09.0_RFP_Section_K_%28Rep_and_Certs_Cover%29.pdfapplication/pdf · 623 KB
- Download📎 DRAFT_B2_04.4_SLAC+Optics+Lab+Structural+Calculations.pdfapplication/pdf · 12.7 MB
- Download📎 DRAFT_B2_02_RFP_Section_A_%28Subcontract_Form%29.pdfapplication/pdf · 657 KB
- Download📎 DRAFT_B2_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdfapplication/pdf · 561 KB
- Download📎 DRAFT_B2_08.04_Sec_J_SF1413-13g.pdfapplication/pdf · 632 KB
- Download📎 DRAFT_B2_08.08_Final_Release.pdfapplication/pdf · 670 KB
- Download📎 DRAFT_B2_10.1_Sec_L_FEH+Optics+Lab+Construction_Bid_Breakdown.pdfapplication/pdf · 576 KB
- Download📎 DRAFT_B2_03_RFP_Section_B_%28Supplies_or_Services_and_Price_Costs%29.pdfapplication/pdf · 610 KB
- Download📎 DRAFT_B2_04.3_Project_Manual_B999_OPTICS_LAB_DESIGN_INCORPORATED_BY_REFERENCE.pdfapplication/pdf · 328 KB
- Download📎 DRAFT_B2_11_RFP_Section_M_Evaluation_Factors_FEH+Optics+Lab.pdfapplication/pdf · 695 KB
- Download📎 DRAFT_B2_08.06_NTP_Submittal_Checklist.pdfapplication/pdf · 1.0 MB
- Download📎 DRAFT_B2_04.0_RFP_Section_C_Cover_%28Specs_SOW%29.pdfapplication/pdf · 603 KB
- Download📎 DRAFT_B2_08.05_SubcontractorFormSQF.pdfapplication/pdf · 627 KB
- Download📎 DRAFT_B2_08.07_Final_Inspection_Report.pdfapplication/pdf · 603 KB
- Download📎 DRAFT_B2_08.01_DBA_WD_CA20260018_05182026_Mod_05.pdfapplication/pdf · 937 KB
- Download📎 DRAFT_B2_00_RFP_Cover_Letter_FEH+Optics+Lab+Construction.pdfapplication/pdf · 683 KB
- Download📎 DRAFT_B2_05_RFP_Section_F_%28Deliveries_Performance%29.pdfapplication/pdf · 596 KB
- Download📎 DRAFT_B2_04.2_B999+OPTICS+LAB+DESIGN.pdfapplication/pdf · 54.7 MB
- Download📎 DRAFT_B2_07_RFP_Section_H_%28Special_Terms_Conditions%29.pdfapplication/pdf · 616 KB
- Download📎 DRAFT_B2_04.1_SOW+-+FEH+Optics+Lab+Construction.pdfapplication/pdf · 1.4 MB
- Download📎 DRAFT_B2_08.03_0366145.pdfapplication/pdf · 1.1 MB
- Download📎 DRAFT_B2_06_NTP_Submittal_Checklist.pdfapplication/pdf · 1.0 MB
- Download📎 DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors_FEH+Optics+Lab.pdfapplication/pdf · 698 KB
- Download📎 DRAFT_B2_08.02_Sec_J_Subcontractor_IIPP_Form.pdfapplication/pdf · 229 KB
- Download📎 DRAFT_B2_08.0_Section_J_%28List_of_Attachments%29.pdfapplication/pdf · 608 KB
- Download📎 DRAFT_B2_10.2_Sec_L_RFP_366145_RFI_Log.pdfapplication/pdf · 555 KB
Similar open contracts
Metadata?
- Notice ID?
- 5f171d506fb64a5491ec822744a4a4fa
- Full path?
- ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.SLAC Natl Accel Lab -DOE Contractor
- Office code?
- 089.8900.899040
- Ingested?
- Jun 25, 2026
- Updated?
- Jul 11, 2026