GovBidAlerts
← All opportunities

180th FW Lift Station Repair

Key dates

Posted
May 20, 2026
Response deadline
Jun 8, 2026, 8:00 PM UTC
Archive date
Archive type
auto15

Classification

Notice type
Solicitation
Base type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Set-aside code
SBA
PSC
Z2ND

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W7NU USPFO ACTIVITY OHANG 180
Office code
021.2100.NGB.JFHQ USPFO OH.USPFO OH PROC.W50S8S
Organization type
OFFICE
Office address
SWANTON, OH, 43558-9645, USA

Place of performance

Street
Street 2
City
Swanton
State
Ohio
Zip
43558
Country
UNITED STATES

Contacts

Description

DESCRIPTION: The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS). SCOPE OF WORK: The required services include, but are not limited to, the following: Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components. Brand Name Installation: Procurement and installation of one (1) new Gorman-Rupp SF Series submersible pump (Model SFV4D). Procurement and installation of one (1) new Allen-Bradley soft starter (fully compatible, like-for-like replacement for the existing SMC Flex model). Integration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration. Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals. PERIOD OF PERFORMANCE: All work must be completed within 90 calendar days after the date of contract award. CONTRACTOR RESPONSIBILITES: In accordance with the PWS and federal labor laws, the contractor is responsible for: Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category. Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals. Testing: Conducting full operational testing and start-up to verify system restoration. Documentation: Ensuring as-built drawings are provided upon project completion. *See Attchments

Attachments (4)

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
5aa5e66aa5264bd28f17e73c8941f15e
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W7NU USPFO ACTIVITY OHANG 180
Office code
021.2100.NGB.JFHQ USPFO OH.USPFO OH PROC.W50S8S
Ingested
May 21, 2026
Updated
Jun 23, 2026