This notice has been superseded. See the latest notice: J--HAULOUT OF THE R/V STURGEON (Award Notice)
Combined Synopsis/SolicitationArchived140G0226R0020
J--HAULOUT OF THE R/V STURGEON
INTERIOR, DEPARTMENT OF THE / US GEOLOGICAL SURVEY / OFC OF ACQUISITION GRANTS-DENVERKey dates?
- Posted?
- Aug 13, 2026
- Response deadline?
- Sep 9, 2026, 5:00 PM UTC
- Archive date?
- Sep 24, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- J019
NAICS?
Issuing office?
- Department?
- INTERIOR, DEPARTMENT OF THE
- Sub-tier?
- US GEOLOGICAL SURVEY
- Office?
- OFC OF ACQUISITION GRANTS-DENVER
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- DENVER, CO, 80225, USA
Contacts?
- Wilson, Maryprimary
Description?
Amendment 0001 provides responses to questions received and includes Attachment 7 Dimensions of Hydrophones NC 1-08 Shielded 4 Post, Attachment 8 W.W Williams Proposal RV Sturgeon Engine and Gear Refresh and Attachment 9 Centek Marine Quote 20734 1. Drawing 26-105-921 HYDROPHONE INSTALLATION states on GENERAL NOTES states "9. MARPORT HYDROPHONES OUTBOARD MOUNTING ANGLE RESEARVED". Please verify who and when that information will be provided to Contractor. Answer: Marport is the company that makes the science equipment. Two hydrophones spaced approximately 3m apart (+/- 1.5m from centerline) along the stern, both oriented vertically and toed outboard 15 degrees. One, preferably port, tilted down 15 degrees, and the other down 25 degrees. See Attachment 7 Dimensions of Hydrophone NC 1-08 Shielded 4 Post. 2. Please 7.3 Remove Propulsion Shafts and Inspect states "All line shaft bearings and shaft seals shall be replaced when clearances fall outside of the acceptable range." Please verify that the cost associated for any replacement bearings or seals, if necessary, will be part of a Condition Found Report and will be included in a Modification. Answer: Correct. Any conditions identified during the removal and inspection of the bearings and seals will need to be documented by the contractor in a Condition Found Report (CFR) and upon receipt, the Government will review the CFR, and if additional work is approved, the cost will be incorporated into a contract modification prior to the contractor performing the replacement.
Other notices in this solicitation?
- Award NoticeJ--HAULOUT OF THE R/V STURGEONSep 24, 2026LATEST
- Combined Synopsis/SolicitationJ--HAULOUT OF THE R/V STURGEONSep 4, 2026
- Combined Synopsis/SolicitationJ--HAULOUT OF THE R/V STURGEONSep 3, 2026
- Combined Synopsis/SolicitationJ--HAULOUT OF THE R/V STURGEONAug 26, 2026
- Combined Synopsis/SolicitationHAULOUT OF THE R/V STURGEONAug 6, 2026
Similar open contracts
Metadata?
- Notice ID?
- 54c7b1c5b5f641d884ad9fbca0d01bea
- Full path?
- INTERIOR, DEPARTMENT OF THE.US GEOLOGICAL SURVEY.OFC OF ACQUISITION GRANTS-DENVER
- Office code?
- —
- Ingested?
- Aug 25, 2026
- Updated?
- Aug 25, 2026