Special NoticeActiveW912DW27RA017
PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222
DEPT OF DEFENSE / DEPT OF THE ARMY / US ARMY CORPS OF ENGINEERS / ENGINEER DIVISION NORTHWESTERN / ENDIST SEATTLE / W071 ENDIST SEATTLEKey dates?
- Posted?
- Sep 25, 2026
- Response deadline?
- Oct 8, 2026, 8:00 PM UTC
- Archive date?
- Oct 23, 2026
- Archive type?
- auto15
Classification?
- Notice type?
- Special Notice
- Base type?
- Special Notice
- Set-aside?
- Small Business Set Aside - Total
- Set-aside code?
- SBA
- PSC?
- Y1AZ
NAICS?
Issuing office?
- Department?
- DEPT OF DEFENSE
- Sub-tier?
- DEPT OF THE ARMY
- Office?
- US ARMY CORPS OF ENGINEERS / ENGINEER DIVISION NORTHWESTERN / ENDIST SEATTLE / W071 ENDIST SEATTLE
- Office code?
- 021.2100.USACE.NWD.NWS.W912DW
- Organization type?
- OFFICE
- Office address?
- SEATTLE, WA, 98134-2329, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- 0
- State?
- Washington
- Zip?
- —
- Country?
- UNITED STATES
Contacts?
- Cassandra Gonzalezprimary
- Shawna Westsecondary
Description?
USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
The definitive removal / demolition work items for each building will require:
a) Hazardous material / debris abatement and removal mostly within the crawl space
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc.
c) Removal at ~ 90% removal of building mechanical – electrical systems
d) Removal of the existing roof EPDM system (but not the roof framing structure)
The definitive repair / new work items for each building will require:
e) New exterior envelope
f) New building mechanical – electrical systems
g) New Thermoplastic Polyolefin (TPO) Roof system
h) Painting of exteriors
Other considerations for site work coordination:
i) New utility connections (mostly by other entities)
j) Shared construction boundaries with adjacent current and future projects
Attachments (1)?
- Download📎 B.01+PLA+Special+Notice+and+Survey+-+27RA017_For+SAM+Posting+24SEP26.pdfapplication/pdf · 121 KB
Similar open contracts
Metadata?
- Notice ID?
- 4ca158ffc3d24a9b83429ee9612c50a9
- Full path?
- DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST SEATTLE.W071 ENDIST SEATTLE
- Office code?
- 021.2100.USACE.NWD.NWS.W912DW
- Ingested?
- Sep 25, 2026
- Updated?
- Sep 25, 2026