This notice has been superseded. See the latest notice: Remediation and Restoration (Combined Synopsis/Solicitation)
Combined Synopsis/SolicitationActive6913G626Q300028
Remediation and Restoration
TRANSPORTATION, DEPARTMENT OF / OFFICE OF THE SECRETARY / 6913G6 VOLPE NATL. TRANS. SYS CNTRKey dates?
- Posted?
- May 22, 2026
- Response deadline?
- Jun 8, 2026, 6:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- F999
NAICS?
Issuing office?
- Department?
- TRANSPORTATION, DEPARTMENT OF
- Sub-tier?
- OFFICE OF THE SECRETARY
- Office?
- 6913G6 VOLPE NATL. TRANS. SYS CNTR
- Office code?
- 069.6901.6913G6
- Organization type?
- OFFICE
- Office address?
- CAMBRIDGE, MA, 02142, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- Bloomingdale
- State?
- Georgia
- Zip?
- 31302
- Country?
- UNITED STATES
Contacts?
- Roland Reganprimary
Description?
The purpose of this solicitation/quote is to provide support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at two facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination sites as cited hereunder. The FAA facilities to be addressed are located in Conyers, GA and Bloomingdale, GA. The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirementThe Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work. Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. (see SOW for more details).
Attachments (11)?
- Download📎 Attachment+IX+-+CON-WD+2015-4471+5-13-26.pdfapplication/pdf · 68 KB
- Download📎 Attachments+I-III++5-22-26.pdfapplication/pdf · 362 KB
- Download📎 Attachment+VII+-+QYL-RTR-RI+Report+11-12-25.pdfapplication/pdf · 1.7 MB
- Download📎 Attachment+VI+-+QYL+RTR+PASI+Report+.pdfapplication/pdf · 943 KB
- Download📎 Attachment+XI++Pricing++5-22-26.pdfapplication/pdf · 95 KB
- Download📎 Attachment+VIII+-+SAV-WD-+2105-4491.pdfapplication/pdf · 68 KB
- Download📎 RFQ+6913G626Q300028.pdfapplication/pdf · 227 KB
- Download📎 Attachment+X+Instructions+5-22-26+.pdfapplication/pdf · 163 KB
- Download📎 Attachment+V+-SAV+OM-RI+Report+Final+2-22-25.pdfapplication/pdf · 22.1 MB
- Download📎 Attachment+IV-+SAV+OM-PASI+Report+-Final.pdfapplication/pdf · 32.7 MB
- Download📎 TABLE+OF+CONTENTS+Pg+4.pdfapplication/pdf · 117 KB
Other notices in this solicitation?
- Combined Synopsis/SolicitationRemediation and RestorationMay 24, 2026LATEST
- Combined Synopsis/SolicitationDemolition, Remediation and RestorationMay 22, 2026LATEST
Similar open contracts
Metadata?
- Notice ID?
- 484813f6ef024c1ca06fce1ef55c6435
- Full path?
- TRANSPORTATION, DEPARTMENT OF.OFFICE OF THE SECRETARY.6913G6 VOLPE NATL. TRANS. SYS CNTR
- Office code?
- 069.6901.6913G6
- Ingested?
- May 23, 2026
- Updated?
- Jun 23, 2026