GovBidAlerts
← All opportunities

Fire Extinguisher Service

Key dates

Posted
Sep 9, 2026
Response deadline
Sep 8, 2026, 9:00 PM UTC
Archive date
Sep 23, 2026
Archive type
auto15

Classification

Notice type
Presolicitation
Base type
Presolicitation
Set-aside
Small Business Set Aside - Total
Set-aside code
SBA
PSC
J012

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W6QM MICC-FT STEWART
Office code
—
Organization type
OFFICE
Office address
FORT STEWART, GA, 31314-3324, USA

Place of performance

Street
—
Street 2
—
City
—
State
GA
Zip
31409
Country
USA

Contacts

Description

This is a non-personnel services contract to provide an initial assessment visit, pickup, inspections/maintenance, and delivery of 1239 fire extinguishers of various types and sizes pickup from various building locations on Hunter AAF. Each battalion within the brigade will schedule consolidated fire extinguisher services separately, on a quarterly basis, during this period. Contractor visits will occur at buildings 7901, 850, 860 and 1296 on HAAF. Services will be provided on a quarterly basis. Extinguisher Inventory 10LB: ABC 150 BC 28 Purple K 17 CO2 3 Halon 2 50LB: ABC 14 5LB: ABC 548 15LB: ABC 51 20LB: ABC 420 125LB: ABC 6 5. Specific Tasks: Tasks will be performed in accordance with NFPA 10, AR 420-5, and OSHA regulations. 5.1. The required fire extinguisher periodic maintenance includes annual inspections, 5/6 years maintenance (depending on the extinguisher type), and 10/12-year hydrostatic testing (depending on the extinguisher type). 5.2. Pressurized fire extinguishers require the following services (inspection, maintenance, and/or hydrostatic testing). 5.3. New extinguishers require an initial inspection to confirm the weight, pressure, condition, and provide the record on an inspection tag; all conducted by qualified personnel. 5.4. Annual inspections/maintenance includes full mechanical check, weighing, and servicing by qualified personnel. 5.5. During 5/6 year maintenance, extinguishers must be disassembled, emptied, and serviced. 5.6. Hydrostatic testing involves the same process as 5/6 year maintenance with an addition structural test to ensure cylinder integrity. 5.7. 14 Days to perform service, unless an understanding is agreed upon between the unit POC, the contracting officer, and the contractor. In the event a unit is activated for deployment, the Government will not be responsible to pay for the quarterly services not used under the contract. The contractor will be notified by the COR, in writing, explaining the length of the deployment and the period during which services will not be required for a particular unit. The contractor will cease billing during the period during which services will not be required for a particular unit.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
30e4c0aee9534d4fba65099b0e7f43e0
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W6QM MICC-FT STEWART
Office code
—
Ingested
Sep 13, 2026
Updated
Sep 13, 2026