Combined Synopsis/SolicitationActive12FPC326Q0043
Cedar Creek Watershed 16 & 16A Remedial Repair -NRCS Texas
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER / FPAC BUS CNTR-ACQ DIVKey dates?
- Posted?
- Jul 23, 2026
- Response deadline?
- Aug 25, 2026, 9:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- Y1QA
NAICS?
Issuing office?
- Department?
- AGRICULTURE, DEPARTMENT OF
- Sub-tier?
- FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
- Office?
- FPAC BUS CNTR-ACQ DIV
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- WASHINGTON, DC, 20250, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- TX
- Zip?
- —
- Country?
- USA
Contacts?
- Blake Boyerprimary
Description?
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs. The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings. The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap. [Site 16A only] Plunge basin erosion has also caused damage to the principal spillway pipe in the vicinity of the pipe outlet. Repair of this damage includes excavating embankment material from around the damaged pipe sections; removing and reconstructing the damaged pipe cantilever, pipe support, and concrete cradle; replacing approximately 40 ft. of the damaged spillway pipe at the outlet; installing a new sand filter collar around a portion of the replaced pipe sections; and reconstructing the earthen embankment in this vicinity. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990, Other Heavy and Civil Engineering Construction. The small business size standard is 45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work and detailed in the specifications, drawings, and plans attached hereto. Magnitude of Requirement: Between $1,000,000 and $5,000,000 Questions must be submitted in writing to Contract Specialist, Blake Boyer, at blake.boyer@usda.gov no later than August 13, 2026, 4PM Eastern Time. Please include the solicitation name and number as the subject line of the email. Please see the attached document(s) for complete details.
Other notices in this solicitation?
Similar open contracts
Metadata?
- Notice ID?
- 1f7096cf0e7f418f8c899bf46b762f2c
- Full path?
- AGRICULTURE, DEPARTMENT OF.FARM PRODUCTION AND CONSERVATION BUSINESS CENTER.FPAC BUS CNTR-ACQ DIV
- Office code?
- —
- Ingested?
- Jul 24, 2026
- Updated?
- Jul 24, 2026