This notice has been superseded. See the latest notice: NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road (Combined Synopsis/Solicitation)
Combined Synopsis/SolicitationActive12FPC326B0010
NRCS-WV Ohio County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER / FPAC BUS CNTR-ACQ DIVKey dates?
- Posted?
- May 18, 2026
- Response deadline?
- Jun 17, 2026, 5:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- Y1QA
NAICS?
Issuing office?
- Department?
- AGRICULTURE, DEPARTMENT OF
- Sub-tier?
- FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
- Office?
- FPAC BUS CNTR-ACQ DIV
- Office code?
- —
- Organization type?
- OFFICE
- Office address?
- WASHINGTON, DC, 20250, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- WV
- Zip?
- —
- Country?
- USA
Contacts?
- Mark Domingoprimary
Description?
Please see attachments and comibined synopsis solicitaiton for further deatails. Ohio County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
Other notices in this solicitation?
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 24, 2026LATEST
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 15, 2026
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 15, 2026
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 11, 2026
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 9, 2026
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadJun 5, 2026
- Combined Synopsis/SolicitationNRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadMay 21, 2026
- Combined Synopsis/SolicitationNRCS-WV Ohio County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow RoadMay 18, 2026
Similar open contracts
Metadata?
- Notice ID?
- 0d4c755864f747b0ba443237a1e0dacb
- Full path?
- AGRICULTURE, DEPARTMENT OF.FARM PRODUCTION AND CONSERVATION BUSINESS CENTER.FPAC BUS CNTR-ACQ DIV
- Office code?
- —
- Ingested?
- Jun 12, 2026
- Updated?
- Jul 9, 2026