GovBidAlerts
← All opportunities

Groundwater Monitoring in Wabasha County, MN

Key dates

Posted
Nov 3, 2026
Response deadline
Nov 18, 2026, 5:00 PM UTC
Archive date
Dec 4, 2026
Archive type
autocustom

Classification

Notice type
Solicitation
Base type
Presolicitation
Set-aside
Small Business Set Aside - Total
Set-aside code
SBA
PSC
F103

NAICS

Issuing office

Department
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W07V ENDIST ST PAUL
Office code
021.2100.USACE.MVD.MVP.W912ES
Organization type
OFFICE
Office address
SAINT PAUL, MN, 55101-1323, USA

Place of performance

Street
Grand Encampment Placement Site - East of Kellogg, MN along Zumbro River -- 44.310928, -91.956431, Greenfield Township, Minnesota
Street 2
—
City
—
State
—
Zip
55945
Country
—

Contacts

Description

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.

Other notices in this solicitation

Similar open contracts

Metadata

Notice ID
0d0a1ed3b2c2491580e2bdad7424c517
Full path
DEPT OF DEFENSE.DEPT OF THE ARMY.W07V ENDIST ST PAUL
Office code
021.2100.USACE.MVD.MVP.W912ES
Ingested
Nov 4, 2026
Updated
Nov 11, 2026