This notice has been superseded. See the latest notice: NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam (Combined Synopsis/Solicitation)
Combined Synopsis/SolicitationActive12FPC326B0012
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
AGRICULTURE, DEPARTMENT OF / FARM PRODUCTION AND CONSERVATION BUSINESS CENTER / FPAC BUS CNTR-ACQ DIVKey dates?
- Posted?
- Jun 11, 2026
- Response deadline?
- Jun 25, 2026, 5:00 PM UTC
- Archive date?
- —
- Archive type?
- auto15
Classification?
- Notice type?
- Combined Synopsis/Solicitation
- Base type?
- Combined Synopsis/Solicitation
- Set-aside?
- Total Small Business Set-Aside (FAR 19.5)
- Set-aside code?
- SBA
- PSC?
- Y1QA
NAICS?
Issuing office?
- Department?
- AGRICULTURE, DEPARTMENT OF
- Sub-tier?
- FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
- Office?
- FPAC BUS CNTR-ACQ DIV
- Office code?
- 012.12D0.12FPAC
- Organization type?
- OFFICE
- Office address?
- WASHINGTON, DC, 20250, USA
Place of performance?
- Street?
- —
- Street 2?
- —
- City?
- —
- State?
- Massachusetts
- Zip?
- 01752
- Country?
- UNITED STATES
Contacts?
- Mark Domingoprimary
Description?
Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Attachments (7)?
- Download📎 Pre+Bid+Site+Visit+Attendance+-+Tyler+Dam.pdfapplication/pdf · 6.2 MB
- Download📎 Attachment+2+Tyler+Dam+Drawings.pdfapplication/pdf · 12.0 MB
- Download📎 Tyler+Dam+Addendum+No.+1++Jun10-2026.pdfapplication/pdf · 32.1 MB
- Download📎 Attachment+3+-+WD+MA20250006+1-30-2026.pdfapplication/pdf · 54 KB
- Download📎 IFB+-+12FPC326B0012+Combined+Synopsis.pdfapplication/pdf · 1.1 MB
- Download📎 Attachment+1+Specifications.pdfapplication/pdf · 1.8 MB
- Download📎 Questions+and+Answers.pdfapplication/pdf · 109 KB
Other notices in this solicitation?
- Combined Synopsis/SolicitationNRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding DamJun 25, 2026LATEST
- Combined Synopsis/SolicitationNRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding DamJun 11, 2026
- Combined Synopsis/SolicitationNRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding DamMay 20, 2026
- Combined Synopsis/SolicitationNRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding DamMay 19, 2026
Similar open contracts
Metadata?
- Notice ID?
- 007f0ef1aa00414482600c2a9436503f
- Full path?
- AGRICULTURE, DEPARTMENT OF.FARM PRODUCTION AND CONSERVATION BUSINESS CENTER.FPAC BUS CNTR-ACQ DIV
- Office code?
- 012.12D0.12FPAC
- Ingested?
- Jun 12, 2026
- Updated?
- Jul 11, 2026