What an RFB is

RFB is one of several names for a sealed, price-based solicitation; IFB (invitation for bid) and ITB (invitation to bid) mean the same thing. The buyer has finished its specifications or drawings, every bidder prices the same thing, and the bids are opened together at a stated time.

Because the scope is fixed, there is nothing to propose. Your bid wins or loses on price, on being responsive (complete, signed, conforming to the documents) and on being responsible (licensed, bonded, insured and able to do the job).

RFB vs RFP

An RFB asks for a price; an RFP asks for a proposal. In an RFB the lowest responsive, responsible bid wins and there are usually no discussions. In an RFP the buyer scores approach, qualifications and price against published criteria and can negotiate. See RFP vs RFB for a side-by-side comparison.

When agencies use RFBs

Construction with completed plans, road and utility work, commodities, vehicles, equipment and routine services such as janitorial, landscaping or snow removal are typical RFB purchases. Many state and local codes require formal sealed bids above a set dollar amount, so most large purchases of goods and construction go out as RFBs or IFBs.

How to respond to an RFB

  • Use the bid form exactly as issued and price every line item and alternate.
  • Acknowledge all addenda and include any bid bond, licenses and affidavits listed.
  • Do not add qualifications or exceptions; they can disqualify the bid.
  • Submit before the opening time, by the stated method, and check the posted bid tabulation afterwards.