GovBidAlerts

Design and Construction government contracts, bids & RFPs

State / local / other government buyer · 43 open bids

Open government contracts, bids and RFPs from Design and Construction, the vendors it awards most, and the industries it buys — aggregated from public procurement data and updated daily.

Match your business

Paste your website — we'll show the open government contracts that fit your business.

Free · no signup · we read your homepage once. We don't store your email.

Design and Construction contract activity

A current snapshot based on 20 of 43 open listings shown on this page. Counts update with the directory.

Listings posted over the last 8 weeks
Listings shown by source
  • New York City20

Deadline outlook

Next 30 days
1
Later
3
Open / rolling
16

Most represented buyers

  1. New York City20

2 of the listings shown were posted in the last 30 days. New York City contributes the largest share (20). New York City is the most represented buyer in this snapshot.

Open opportunities

  • Due Nov 20, 2026
    Posted Oct 20, 2026
  • 85027P0001-PW348-91,-94_RC for CM/Design/Build for Petroleum Storage Tank Sumps, Citywide
    New York City

    The RFx will be accessible through the PASSPort Public Portal: https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public Enter 85027P0001on the 'Keywords' field to search for the project. The New York City Department of Design and Construction (DDC), Division of Public Building, intends to enter into requirements contracts for the design and construction as described in the Request for Proposals (RFP). DDC is engaged in a major program to remove/upgrade/replace petroleum storage…

    More
    Due Dec 3, 2026
    Posted Oct 19, 2026
  • SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the Guy R Brewer Trunk sewer
    New York City

    Responses to this RFQ must be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal at the following website: https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public. Click on the Prequalified Lists blue box. To quickly locate the RFQ, insert the PQL Number (PQL000172) into the Keywords search field.

    More
    Due Jul 31, 2030
    Posted Aug 5, 2026
  • SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the GUY R BREWER Trunk sewer
    New York City

    Responses to this RFQ must be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal at the following website: https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public. Click on the Prequalified Lists blue box. To quickly locate the RFQ, insert the PQL Number (PQL000172) into the Keywords search field.

    More
    Due Jul 31, 2030
    Posted Jul 10, 2026
  • General Construction - Large Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects would be greater than $15,000,000.…

    More
    Due —
    Posted Nov 12, 2024
  • Emergency Sewer Work
    New York City

    The Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to reconstruct and/or replace collapsed or otherwise defective sewers and appurtenances for which the City is responsible or otherwise deemed necessary as ordered by the Engineer, and to perform ancillary restoration work, on an emergency basis, in all five boroughs of the City of…

    More
    Due —
    Posted Apr 27, 2026
  • General Construction - Medium Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects will range from $5,000,000 to less than $15,000,000.…

    More
    Due —
    Posted Nov 12, 2024
  • Reconstruction and Restoration of Landmarked and Landmark-Quality Buildings
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to perform small, medium and large reconstruction and restoration work of landmarked and landmark-quality buildings for various capital construction projects. It is anticipated that the estimated construction cost for these projects will range from…

    More
    Due —
    Posted Apr 24, 2025
  • Emergency Water Main Work
    New York City

    The Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required f o r the reconstruction and replacement, as ordered by the Engineer, of broken water mains of the City-owned water supply distribution system and do other ancillary restoration work, on an emergency basis, system wide. Address to Request Documents and Information:…

    More
    Due —
    Posted Apr 27, 2026
  • MWBE General Construction - Small Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of Minority and Women-owned Business Enterprise (M/WBE) general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. This PQL will be limited to firms who have been certified as M/WBEs through the City Department of Small Business…

    More
    Due —
    Posted Apr 27, 2026
  • General Construction Medium Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects will range from $5,000,000 to less than $15,000,000. Address to Request Documents and…

    More
    Due —
    Posted Apr 27, 2026
  • General Construction Large Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects would be greater than $15,000,000. Address to Request Documents and Information:…

    More
    Due —
    Posted Apr 27, 2026
  • INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to install Cold Fluid Applied Reinforced Membrane Roofing System or approved equal for various capital construction projects. It is anticipated that the estimated construction cost for these types of roof projects will range from $100,000 to $10,000,000.…

    More
    Due —
    Posted Apr 27, 2026
  • Due —
    Posted Jun 7, 2019
  • PQL LABEL: GENERAL CONSTRUCTION MEDIUM PROJECTS
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing apre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to performgeneral construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projectswill range from $3,000,000 to less than $10,000,000.…

    More
    Due —
    Posted Apr 27, 2023
  • General Construction  Small Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of Minority and Women-owned Business Enterprise (M/WBE) general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. This PQL will be limited to firms who have been certified as M/WBEs through the City Department of Small Business…

    More
    Due —
    Posted Nov 12, 2024
  • Reconstruction and Restoration of Landmarked and Landmark-Quality Buildings
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to perform small, medium and large reconstruction and restoration work of landmarked and landmark-quality buildings for various capital construction projects. It is anticipated that the estimated construction cost for these projects will range from…

    More
    Due —
    Posted Nov 12, 2024
  • General Construction Large Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects would be greater than $15,000,000.

    More
    Due —
    Posted Apr 24, 2025
  • General Construction Medium Projects
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of general contractors for furnishing all labor, materials and equipment, necessary and required to perform general construction work on various capital construction projects. It is anticipated that the estimated construction cost for these projects will range from $5,000,000 to less than $15,000,000.

    More
    Due —
    Posted Apr 24, 2025
  • Emergency Sewer Work
    New York City

    The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to reconstruct and/or replace collapsed or otherwise defective sewers and appurtenances for which the City is responsible or otherwise deemed necessary as ordered by the Engineer, and to perform ancillary restoration work, on an emergency basis, in the five…

    More
    Due —
    Posted Apr 24, 2025

Showing 20 of 43 open bids.

How to win Design and Construction contracts

  1. Register as a vendor on Design and Construction's procurement portal.
  2. Match your NAICS / commodity codes to what it buys (see the top codes above).
  3. Ask about local small-business and vendor-preference programs — see set-asides explained.
  4. Monitor its open bids above, or set a GovBidAlerts alert.

New to government contracting? Start with our GovCon guides and glossary.