closed🌐 townofmanchester24/25-10
DEMOLITION AND HAZARDOUS MATERIAL ABATEMENT - 942 MAIN STREET
townofmanchester / Facilities
Description
The Town of Manchester is requesting bids for the demolition and hazardous material abatement of 942-974 Main Street (single story building of approximately 20,000sf with a full basement and seven (7) retail spaces located on the first floor) in Manchester, Connecticut. The project will be divided into 2 phases: Phase 1; Mobilization, Demolition, and removal of the first floor, including but not limited to the roof top equipment, roof, walls, partitions, and interior contents within first floor, with floor surface to remain. Work includes the removal of all hazmat, asbestos, and pcb items within this area. Site shall be left fully demobilized except for the perimeter construction fence. Phase 1; Mobilization, and demolition of entire building…All demolition debris to be pushed into basement within perimeter foundation walls, including but not limited to roof top equipment, roof, walls, partitions, and interior contents. All demolished material shall remain in place until removal during phase 2. Concrete floor slab is to be broken up. Perimeter concrete foundation walls (including concrete, masonry, and steel) to be removed to 4” (inches) +/- below grade. No concrete, masonry or steel shall be protruding above grade . Phase 1 work also includes the removal of all hazmat, asbestos, and pcb items within this area. Site shall be left fully demobilized except for the perimeter construction fence and completed demolition within fence perimeter. IMPORTANT: PHASE 1 WORK MUST BE COMPLETED NO LATER THAN NOVEMBER 15, 2024. Phase 2 , RE-mobilization, Demolition, and removal of the first-floor structure & basement, including but not limited to floor/basement ceiling, top of foundation walls (-2 feet below grade), partitions, and interior contents within foundations walls, breaking up the basement floor, and the addition of fill to level off site. Work includes the removal of all remaining hazmat, asbestos, and pcb items. Phase 2; RE-mobilization, and debris removal…All demolition debris to be removed. Phase 2 work also includes complete backfill and site restoration (fence removal and sidewalk repairs).
Details?
- Posted
- Sep 13, 2024
- Response deadline
- Sep 27, 2024, 3:00 PM UTC
- Status
- closed
- Buyer
- townofmanchester
- Department
- Facilities
- Jurisdiction
- townofmanchester
- Reference #
- 24/25-10
- Summary
- <p><span style="font-size: 16px;">The Town of Manchester is requesting bids for the demolition and hazardous material abatement of 942-974 Main Street (single story building of approximately 20,000sf
- Is Paused
- false
- Template Title
- Invitation to Bid
- Copy Count
- 0
- Government Organization City
- Manchester
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/72a277c4-2bbf-462d-8a00-2b62506f8314_Town_Seal_(2)_(002)_high_resolution_.png
- Government Organization Name
- Town of Manchester
- Government Organization State
- CT
- Government Organization Website
- https://www.townofmanchester.org/
- Government Organization Zip Code
- 06040
- Government Organization Address1
- Lincoln Center
- Government Organization Address2
- 494 Main Street
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Contact
(860)647-3105
Finding similar opportunities…
This listing is a summary from townofmanchester's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 115873,
"_slug": "townofmanchester",
"title": "DEMOLITION AND HAZARDOUS MATERIAL ABATEMENT - 942 MAIN STREET",
"status": "closed",
"summary": "<p><span style=\"font-size: 16px;\">The Town of Manchester is requesting bids for the demolition and hazardous material abatement of 942-974 Main Street (single story building of approximately 20,000sf with a full basement and seven (7) retail spaces located on the first floor) in Manchester, Connecticut. </span></p><p><span style=\"font-size: 16px;\">The project will be divided into 2 phases:</span></p><p><span style=\"font-size: 16px;\"> </span></p><p><strong><s>Phase 1;</s></strong><s> Mobilization, Demolition, and removal of the first floor, including but not limited to the roof top equipment, roof, walls, partitions, and interior contents within first floor, with floor surface to remain. Work includes the removal of all hazmat, asbestos, and pcb items within this area. Site shall be left fully demobilized except for the perimeter construction fence.</s></p><p> </p><p><strong>Phase 1;</strong> Mobilization, and demolition of entire building…All demolition debris to be pushed into basement within perimeter foundation walls, including but not limited to roof top equipment, roof, walls, partitions, and interior contents. All demolished material shall remain in place until removal during phase 2. Concrete floor slab is to be broken up. Perimeter concrete foundation walls (including concrete, masonry, and steel) to be removed to 4” (inches) +/- below grade. <strong>No concrete, masonry or steel shall be protruding above grade</strong>. Phase 1 work also includes the removal of all hazmat, asbestos, and pcb items within this area. Site shall be left fully demobilized except for the perimeter construction fence and completed demolition within fence perimeter.</p><p><span style=\"font-size: 16px;\"><br><span style=\"text-decoration: underline;\"><strong><em>IMPORTANT: PHASE 1 WORK MUST BE COMPLETED NO LATER THAN NOVEMBER 15, 2024.</em></strong></span></span></p><p> </p><p><strong><s>Phase 2</s></strong><s>, RE-mobilization, Demolition, and removal of the first-floor structure & basement, including but not limited to floor/basement ceiling, top of foundation walls (-2 feet below grade), partitions, and interior contents within foundations walls, breaking up the basement floor, and the addition of fill to level off site. Work includes the removal of all remaining hazmat, asbestos, and pcb items.</s></p><p> </p><p><strong>Phase 2;</strong> RE-mobilization, and debris removal…All demolition debris to be removed. Phase 2 work also includes complete backfill and site restoration (fence removal and sidewalk repairs).</p><p> </p><p> </p>",
"isPaused": false,
"template": {
"title": "Invitation to Bid"
},
"addendums": [
{
"id": 48387
},
{
"id": 48399
},
{
"id": 48410
},
{
"id": 48384
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2024-09-12T18:12:20.846Z",
"department": {
"id": 1894,
"name": "Facilities"
},
"government": {
"code": "townofmanchester",
"organization": {
"city": "Manchester",
"logo": "https://assets.procurement.opengov.com/logo-uploads/72a277c4-2bbf-462d-8a00-2b62506f8314_Town_Seal_(2)_(002)_high_resolution_.png",
"name": "Town of Manchester",
"phone": "(860)647-3105",
"state": "CT",
"website": "https://www.townofmanchester.org/",
"zipCode": "06040",
"address1": "Lincoln Center",
"address2": "494 Main Street",
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "24/25-10",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2024-09-27T15:00:33.046Z",
"releaseProjectDate": "2024-09-13T18:13:00.074Z"
}