GovBidAlerts
← My Opportunities
IFBopen🌐 Illinois DOT035-80D00

(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County. (Cook)

Illinois DOT

Description

(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County.

Details

Response deadline
Jun 12, 2026, 12:00 PM UTC
Type
IFB
Status
Active
Buyer
Illinois DOT
Jurisdiction
Illinois DOT
Location
IL
Reference #
035-80D00
Bulletin
(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb an
Counties
Cook
Finding similar opportunities…

This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.