IFBopen🌐 Illinois DOT035-80D00
(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County. (Cook)
Illinois DOT
Description
(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County.
Details?
- Response deadline
- Jun 12, 2026, 12:00 PM UTC
- Type
- IFB
- Status
- Active
- Buyer
- Illinois DOT
- Jurisdiction
- Illinois DOT
- Location
- IL
- Reference #
- 035-80D00
- Bulletin
- (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb an
- Counties
- Cook
Finding similar opportunities…
This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.