GovBidAlerts
← My Opportunities
open🌐 RFPMart: USA (all categories)http://www.rfpmart.com/1130248-us-fed-barkley-spillway-gate-machinery-painting.html

US-FED-00000382436 - Barkley Spillway Gate Machinery Painting - Deadline July 11,2026

Description

The U.S. Army Corps of Engineers (USACE), Nashville District (LRN), intends to issue an Invitation for Bid (IFB) solicitation for a firm fixed–price (FFP) construction contract for the Barkley Dam Spillway Gate Machinery Painting in Grand Rivers, Kentucky.This is a Pre–solicitation Notice. This Notice is being issued for planning and information purposes only. This notice is not a solicitation, nor is it to be construed as a commitment by the Government. The Government will not pay for any effort expended in responding to this notice, nor will the Government accept bids as a result of this notice.POINT OF CONTACT: The Primary Contract Specialist for this solicitation is Kenyanna Jennings, [email? redacted] Any communication regarding this notice should be made in writing sent via email and must identify with the Solicitation number, company name, address, phone number and point of contact.PROJECT DESCRIPTION: The scope of this requirement includes the cleaning, prepping, and painting the spillway machinery at all twelve (12) gates with one consistent coating. While following work restrictions below, the contractor will remove all coating that is not tightly adhered to the steel substrate and repair any existing corrosion. The final surface must be brought back to like new conditions. The use of power shrouded tools with vacuum collection must be used to meet the requirements of SSPC–SP–3 (Power Tool Cleaning) Surface Preparation and meet the requirements of lead collection and disposal. Where SSPC–SP–3 is not physically possible, the contractor must still perform SSPC–SP–1 and the prescribed coating system.Minimum Technical Requirements“ and “Critical Features of Work: The following work restrictions must apply to the contractor.1. The contractor must not disassemble any “active machinery components“ including motors, gearboxes, bearings, or similar equipment.2. The contractor may remove machinery covers, guards, and other non–active components as required to coat the machinery as much as possible.3. The contractor may utilize the project`s intake gantry crane and spillway maintenance platform as required.4. No more than three gates must be out of service at any given time.5. The Contractor must coordinate with project staff for the placement of bulkheads to allow the gate to be raised and provide access to all machinery components that require coating.6. The Corps must always have access to the intake crane for maintenance and emergencies.The anticipated period of performance for the contract is approximately 450 calendar days from the notice to proceed.This description is not intended to be all encompassing and is subject to change. No solicitation document exists at this time. The plans and specifications will be available with the solicitation announcement. The anticipated release date for the solicitation is on or around 17 July 2026. The solicitation will be posted to both Sam.gov and Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.DISCLOSURE OF MAGNITUDE OF THE CONSTRUCTION PROJECT: The estimated price range is between $1,000,000 and $5,000,000.NAICS CODE AND SBA SIZE STANDARD: 238320 Painting and Wall Covering; $19,000,000TYPE OF SET–ASIDE: Serviced–Disabled Veteran–Owned Small Businesses (SDVOSB)SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and Procurement Integrated Enterprise Environment (PIEE) at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted.ADDITIONAL INFORMATION:Information regarding USACE`s process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business–With–Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here“.Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is, and will continue to be, the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to industry questions and answers, etc. The Government will not be maintaining a mailing list.

Details

Posted
Jun 14, 2026
Response deadline
Jul 11, 2026, 11:59 PM UTC (0d)
Status
open
Jurisdiction
RFPMart: USA (all categories)
Item
US-FED-00000382436 - Barkley Spillway Gate Machinery Painting - Deadline July 11,2026 The U.S. Army Corps of Engineers (USACE), Nashville District (LRN), intends to
Finding similar opportunities…

This listing is a summary from RFPMart: USA (all categories)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.