open🌐 RFPMart: USA (all categories)http://www.rfpmart.com/1174437-us-fed-az-bl-colo-75281-burro-creek-road.html
US-FED-00000394387 - AZ BL COLO 7528(1) Burro Creek Road - Deadline September 30,2026
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLESmall Business Set–AsidePROJECT NUMBER: AZ FLAP PIM FR510(1)PROJECT NAME: Burro Creek RoadPROJECT DESCRIPTION:Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project`s length is approximately 1.3 miles.SCOPE OF THE WORK:The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concernsSafety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.PRINCIPAL WORK ITEMS:Roadway Aggregate: 1,600 TONSDitch Reconditioning: 2,000 LNFTFull Depth Reclamation: 1.3 MILEAsphalt Concrete Pavement: 3,600 TON18–Inch Pipe Culvert: 100 LNFT24–Inch Pipe Culvert: 175 LNFT
Details?
- Posted
- Sep 18, 2026
- Response deadline
- Sep 30, 2026, 11:59 PM UTC (12d)
- Status
- open
- Jurisdiction
- RFPMart: USA (all categories)
- Has Description
- true
- Item
- US-FED-00000394387 - AZ BL COLO 7528(1) Burro Creek Road - Deadline September 30,2026 THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLESma
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 116,000+ open bids from 2,400+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from RFPMart: USA (all categories)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.