GovBidAlerts
OpenNon-State AgencyState

RFB 27-54218 Burruss Park Bridge Construction

City of Marietta

Due Closes in 16 daysRef. PE-63363-NONST-2027-000000034

At a glance

What

The City of Marietta wishes to remove an existing triple (42") culvert drain passing under Burriss Park main trail, replacing it with a 60' prefabricated bridge.

Where
Georgia (state)
Key dates
  • Posted: Nov 17, 2026
  • Deadline: Fri, Dec 4, 2026 · 10:00 AM EST (closes in 16 days)
How to respond

Description

The City of Marietta wishes to remove an existing triple (42") culvert drain passing under Burriss Park main trail, replacing it with a 60' prefabricated bridge. The Scope of Work includes but is not limited to the removal of the existing culverts, headwalls, trail surface, trees, etc. Project includes the construction of bridge abutments, improvements to the stream bank and the installation of the prefabricated vehicular rated bridge. The bridge will be furnished to the site by the city. The general contractor will be required to coordinate all their work with delivery of the bridge.

Documents (1)

  • 📎 downloadAttachment
    application/pdf · 1.2 MB
    Download
All notice detailsShow ↓
Posted
Nov 17, 2026
Type
Non-State Agency
Status
Open
Jurisdiction
Georgia (state)
Reference #
PE-63363-NONST-2027-000000034
Approval
A
Ending In
16 days
Noia Days
0
Agency Code
63363
Financial Year
2027
Government Type
city
Sole Source
No

This listing is a summary from Georgia (state)'s open procurement data. The full solicitation documents are on the source portal.