GovBidAlerts
OpenLocal

New AC Units for DAFT Building and Secondary Building at WRF

City of Pueblo · Wastewater

Due Closes in 21 daysRef. 26-050

At a glance

What

The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrical for the units and thermostats, and install new…

Where
City of Pueblo
Key dates
  • Posted: Nov 17, 2026
  • Deadline: Wed, Dec 9, 2026 · 1:30 PM EST (closes in 21 days)
How to respond

Description

The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrical for the units and thermostats, and install new 1-ton rooftop air-conditioning units at each building (Daft and Secondary Buildings) using the existing roof openings where applicable. Contractor shall complete all work as outlined within this Invitation for Bid. Submitted prices must include furnishing of all labor, materials, and equipment for the supply, delivery, installation, manufacture, testing, warranty, and other materials and services required for the work of this project. Workmanship and material to be first quality throughout; in the absence of comment on particular points, industry standard practice should be presumed to prevail. All standard factory equipment shall be included; no deletions of standard factory equipment will be permitted unless specifically superseded in these specifications. Accessories not specifically mentioned herein, but necessary to furnish complete units ready for use, shall also be included.

Documents (8)

  • 📎 CDOT_Required_Forms.pdf
    application/pdf · 100 KB
    Download
  • 📎 Federal_Labor_Standard_Provisions.pdf
    application/pdf · 907 KB
    Download
  • 📎 FFATA_Reporting_Form.pdf
    application/pdf · 125 KB
    Download
  • 📎 Licensing_and_Sales_Tax_Information.pdf
    application/pdf · 413 KB
    Download
  • 📎 project_document_snapshot.pdf
    application/pdf · 663 KB
    Download
  • 📎 Sample_Contract_Documents_(CDOT_Projects).pdf
    application/pdf · 237 KB
    Download
  • 📎 Sample_Contract_Documents.pdf
    application/pdf · 218 KB
    Download
  • 📎 Section_3_Utilization_Plan_for_Contractors.pdf
    application/pdf · 440 KB
    Download
All notice detailsShow ↓
Posted
Nov 17, 2026
Status
open
Department
Wastewater
Jurisdiction
City of Pueblo
Reference #
26-050
Summary
The awarded Contractor for this project shall assess both sites at the Wastewater Reclamation Facility (WRF), remove the Secondary Building’s existing swamp cooler, install new electrica
Government Code
pueblo
Government Organization State
CO
Government Organization Website
https://www.pueblo.us
Government Organization Zip Code
81003
Government Organization Address1
230 S. Mechanic St.
Government Organization Country Code
US
Is Paused
No
Template Title
Public Improvement Invitation for Bid
Copy Count
0
Government Organization Timezone
America/Denver
Government Organization Phone Country
1

This listing is a summary from City of Pueblo's open procurement data. The full solicitation documents are on the source portal.