GovBidAlerts
OpenIFBState

STPAA-FMGR-HSIP-0195(509), Walker

Alabama DOT

Due Closes in 15 daysRef. 120426-STPAA-FMGR-HSIP-0195(509)

At a glance

What

Contractor Name: PROPOSAL NO. _______________________ CONTRACT ID: 20261204035 Of (City, State): ALDOT Contractor Identification Number: Alabama General Contractors License Number: PROJECT NO(S).

Where
AL
Key dates
  • Deadline: Fri, Dec 4, 2026 · 11:59 PM CST (closes in 15 days)
How to respond

Description

Contractor Name: PROPOSAL NO. _______________________ CONTRACT ID: 20261204035 Of (City, State): ALDOT Contractor Identification Number: Alabama General Contractors License Number: PROJECT NO(S). STPAA-FMGR-HSIP-0195(509) WALKER COUNTY, ALABAMA Proposal of for constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, Traffic Signal Upgrades (Backplate Installation and Signal Detection), and Traffic Stripe on SR-195 from the junction of SR-5 in Jasper to a point 0.670 mile south of the junction of Browns Lane. Length 5.643 mi. In the County of WALKER, State of Alabama. T

From the solicitation document — full text under Documents.

Documents (3)

  • 📎 04Dec035.EBSX
    EBSX/project_letting · 7 KB
    Download
    We couldn't read the text of this document.
  • 📎 20261204_Call_035_Plans.pdf
    Download
    We couldn't read the text of this document.
  • 📎 20261204_Call_035_Proposal.pdf
    application/pdf · 1.5 MB
    Download
All notice detailsShow ↓
Type
IFB
Status
open
Jurisdiction
Alabama DOT
Location
AL
Reference #
120426-STPAA-FMGR-HSIP-0195(509)
Call
035
County
WALKER
Project
STPAA-FMGR-HSIP-0195(509)
Letting Date
Dec 4, 2026

This listing is a summary from Alabama DOT's open procurement data. The full solicitation documents are on the source portal.