closed🌐 City of Lynnwood3671 (ReAd)
ITB - Scriber Creek Trail Phase 3 Construction (Readvertisement)
City of Lynnwood / Public Works Engineering
Description
The improvement of approximately 21,700 lineal feet of shared use trail between 200TH ST SW and Wilcox Park and approximately 400 lineal feet of paved pathway between the shared use trail and 53rd AVE SW by clearing and grubbing, trimming wetland vegetation, removing structures and obstructions, removing timber bridges and wood abutments, roadway excavation, furnishing and installing steel pin piles, furnishing and installing elevated boardwalk structures, placing aggregates and hot mix asphalt, removing invasive species, landscaping including wetland and wetland buffer enhancement and plantings, installing benches, modifying catch basins, modifying traffic signal system, installing illumination system, erosion control, traffic control, pavement markings, and other work. Most of the work is located within the floodplain and buffer of a peat wetland and is subject to soil saturation and varying water levels.
Details?
- Posted
- Dec 31, 2024
- Response deadline
- Jan 22, 2025, 10:00 PM UTC
- Status
- closed
- Buyer
- City of Lynnwood
- Department
- Public Works Engineering
- Jurisdiction
- City of Lynnwood
- Reference #
- 3671 (ReAd)
- Summary
- The improvement of approximately 21,700 lineal feet of shared use trail between 200TH ST SW and Wilcox Park and approximately 400 lineal feet of paved pathway between the shared use trail and 53rd
- Government Code
- lynnwoodwa
- Government Organization City
- Lynnwood
- Government Organization State
- WA
- Government Organization Website
- https://www.lynnwoodwa.gov
- Government Organization Zip Code
- 98036
- Government Organization Address1
- 19100 44th Ave W
- Government Organization Country Code
- US
Finding similar opportunities…
This listing is a summary from City of Lynnwood's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.