OTHERopen🌐 Thomas Jefferson National Accelerator Facility (JLab)9934
CHL Control Room Fiber Installation
Thomas Jefferson National Accelerator Facility (JLab)
All open bids & awards from Thomas Jefferson National Accelerator Facility (JLab) →
Description
The scope of the project is to install (2) fiber-optic cables originating from the B08 Control Room Rack to (2) separate buildings (B01 & B85). Installation will require entry into the manhole system. The subcontractor is responsible for all required training and all equipment needed for a complete and functioning system. Entry into each manhole will require a confined space entry permit. The subcontractor is responsible for all confined space entry equipment, including a pump with sediment bag, for a safe entry into the confined space. All terminations, termination equipment, and cabling shall be tested. The test report shall be turned over to the TR prior to final payment. Lengths of fiber given in this scope of work are approximate. The subcontractor is responsible for obtaining accurate distances for fiber prior to bid. Each fiber to be Corning FREEDM single-mode I/O fiber. Ends to be terminated with LC ends. Fiber Distribution Units (FDUs) shall be Corning type CCH.
Details?
- Posted
- Sep 19, 2025
- Type
- OTHER
- Category
- SERVICES
- Status
- open
- Buyer
- Thomas Jefferson National Accelerator Facility (JLab)
- Jurisdiction
- Thomas Jefferson National Accelerator Facility (JLab)
- Reference #
- 9934
- Has Description
- true
- Last Updated
- Oct 6, 2025
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 121,000+ open bids from 2,400+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from Thomas Jefferson National Accelerator Facility (JLab)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.