open🌐 South Carolina (SCBO)25035
Caldwell Street Water Line Replacement
City of Clinton
Description
Installation of approximately 1,150 linear feet of 6-inch PVC and DIP water lines • Installation of two gate valves and two fire hydrant assemblies • Approximately 180 linear feet of asphalt road patching • Three driveway dry bores • Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will be held at 2:00 pm on July 16th, 2026, at 1219 Gary Street, Clinton, SC 29325, inside the Operations Conference Room.
Details?
- Posted
- Jul 7, 2026
- Response deadline
- Jul 30, 2026, 12:00 AM UTC (19d)
- Status
- open
- Buyer
- City of Clinton
- Jurisdiction
- South Carolina (SCBO)
- Reference #
- 25035
- Contact
- Summit Engineering Group, Inc
Finding similar opportunities…
This listing is a summary from South Carolina (SCBO)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.