OpenState
Underground Utility Infrastructure Replacement
Due Closes in 16 daysRef. H27-N462-LC
At a glance
- What
The project shall consist of extending hot water service toward the new STEM building and Thomas Cooper Library (TCL).
- Where
- South Carolina (SCBO)
- Key dates
- Posted: Nov 24, 2026
- Deadline: Fri, Dec 11, 2026 (closes in 16 days)
- How to respond
Submit through the buyer's portal ↗ · how to bid
- Documents
- 1 document ↓
Description
The project shall consist of extending hot water service toward the new STEM building and Thomas Cooper Library (TCL). The AE shall provide investigation, engineering, design, permitting support, bid documents and construction-phase services for the West Energy Tunnel Low Temperature Hot Water (LTHW) piping installation.
Documents (1)
- Download📎 H27-N462-LC_SE-210_lc112426.pdfapplication/pdf · 50 KB
All notice detailsShow ↓
- Posted
- Nov 24, 2026
- Status
- open
- Jurisdiction
- South Carolina (SCBO)
- Reference #
- H27-N462-LC
- Contact
- Marvin Briscoe
This listing is a summary from South Carolina (SCBO)'s open procurement data. The full solicitation documents are on the source portal.
Closes in 16 days🔔 Get alerts for bids like this