GovBidAlerts
← My Opportunities
IFBopen🌐 Illinois DOT052-64V40

Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft. (Rock Island)

Illinois DOT

Description

Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft.

Details

Response deadline
Jun 12, 2026, 12:00 PM UTC
Type
IFB
Status
Active
Buyer
Illinois DOT
Jurisdiction
Illinois DOT
Location
IL
Reference #
052-64V40
Bulletin
Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of I
Counties
Rock Island
Finding similar opportunities…

This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.