IFBopen🌐 Illinois DOT052-64V40
Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft. (Rock Island)
Illinois DOT
Description
Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft.
Details?
- Response deadline
- Jun 12, 2026, 12:00 PM UTC
- Type
- IFB
- Status
- Active
- Buyer
- Illinois DOT
- Jurisdiction
- Illinois DOT
- Location
- IL
- Reference #
- 052-64V40
- Bulletin
- Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of I
- Counties
- Rock Island