RFP-SOQ for professional engineering services for the Basin 14 PVWS Project
Cedar Valley Water Conservancy · CVWCD
Due Closes in 11 daysRef. 1117631
At a glance
- What
Cedar Valley Water Conservancy invites qualified professional engineering firms and consultant teams to submit Statements of Qualifications ('SOQs') for the Pine Valley Water Supply Project ('PVWS' or 'Project').
- Where
- Cedar City, UT
- Key dates
- Posted: Oct 22, 2026
- Deadline: Mon, Nov 30, 2026 · 2:00 PM MST (closes in 11 days)
- How to respond
mandi@cedarvalleywaterutah.gov
Submit through the buyer's portal ↗ · how to bid
- Documents
- None attached here — see the source portal
Description
Cedar Valley Water Conservancy invites qualified professional engineering firms and consultant teams to submit Statements of Qualifications ('SOQs') for the Pine Valley Water Supply Project ('PVWS' or 'Project'). The top three highest scoring firms will qualify for the RFP portion of the selection process (Stage 2) and ultimately a firm/team will be selected to complete a conceptual design as outlined in Section 11. The selected firm shall advance the Project to an integrated conceptual-design level sufficient for the Board to select or direct the preferred system concept, identify material investigations and authorizations, establish a defensible implementation path, and authorize later design if desired. 'Concept Design' describes the overall conceptual maturity of the program and does not require every discipline or facility to be advanced to an identical percentage.
Read more ↓Show less ↑
Defined estimated percentages of each discipline or facility have been defined in the scoping below. The selected firm shall recommend greater development where necessary to resolve a decision or reduce a material risk and shall identify matters that properly remain for later design. The work shall be decision-driven, transparent, and traceable. Each recommendation shall identify: the decision being made; applicable requirements and assumptions; alternatives considered; data used and data quality; engineering criteria; environmental, land, operational, schedule, energy, lifecycle, and regional consequences; uncertainty and sensitivity; recommended next action; and the person accountable for the analysis. The purpose of the initial assignment is to provide the Board with a defensible and integrated basis for determining which system alternatives should advance, the appropriate sequencing of implementation, and the associated reliability, environmental safeguards, operational approach, land requirements, schedule, and planning level costs. The work shall resolve, or substantially narrow, the Project Decisions identified in Section 3.4 and produce the deliverables described in Section 12.1.3 Stage 1 qualifications and Stage 2 finalist. This is a two-stage procurement for design professional services. Stage 1 evaluates competence, experience, personnel, Project understanding, and related qualifications and identifies three finalists to proceed to Stage 2. Each finalist will receive the same Stage 2 Finalist Proposal request and an equal opportunity to submit a Project specific proposal and participate in an interview. As part of Stage 2, each finalist will also be requested to submit a separate, sealed fee or price bid concurrently with its Project-specific proposal. The sealed bids will remain unopened until Cedar Valley Water Conservancy has completed its Stage 2 qualifications evaluation and finalized the ranking of the finalists based on their proposals and interviews, without consideration of fees or pricing. No fees, billing rates, multipliers, cost proposals, grant or financing commitments, construction prices, or other price information shall be submitted in Stage 1. Submit the Stage 1 SOQ electronically to paul@cedarvalleywaterutah.gov no later than November 30, 2026, 2:00 P.M. MOUNTAIN TIME. The Conservancy's designated system clock controls. Late submissions will not be opened or considered except as required by law. A Proposer is responsible for confirming successful upload or delivery before the deadline. File size limits, naming conventions, and portal instructions will be stated by addendum or on the submission page. Send written questions to Curtis Nielson at cnielson@ensignutah.com and/or to Paul Monroe at paul@cedarvalleywaterutah.gov with the subject line 'PVWS Design RFQ Question' no later than the deadline in Section 5.2. Identify the solicitation section and ask one clear question per numbered item. The Conservancy may consolidate or rephrase questions. Answers affecting the solicitation will be issued by written addendum. https://cedarvalleywaterutah.gov/engineering-basin-14-pv-water-supply-project/
All notice detailsShow ↓
- Posted
- Oct 22, 2026
- Type
- RFP
- Status
- open
- Department
- CVWCD
- Jurisdiction
- Cedar Valley Water Conservancy
- Location
- Cedar City, UT
- Reference #
- 1117631
- Place of performance ZIP
- 84720
- Country
- USA
- City
- Cedar City
- Agenda
- Cedar Valley Water Conservancy invites qualified professional engineering firms and consultant teams to submit Statements of Qualifications ('SOQs') for the Pine Valley Water Supply Project ('PVWS' or
- Address
- 710 S Westview Drive, Cedar City, UT 84720
- Platform
- utah_pmn
- Event Deadline
- 11/30/26 02:00 PM