OpenState
R-7282 Fleet Services EV Charging Depot
Due Closes in 5 daysRef. PW-26-800
At a glance
- What
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment.
- Where
- City of Long Beach, CA (Long Beach Buys)
- Key dates
- Deadline: Fri, Dec 4, 2026 · 2:00 PM EST (closes in 5 days)
- How to respond
Submit through the buyer's portal ↗ · how to bid
- Documents
- None attached here — see the source portal
Description
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.
All notice detailsShow ↓
- Status
- open
- Jurisdiction
- City of Long Beach, CA (Long Beach Buys)
- Reference #
- PW-26-800
- Bid Opening Date
- 12/04/2026 11:00 AM
This listing is a summary from City of Long Beach, CA (Long Beach Buys)'s open procurement data. The full solicitation documents are on the source portal.
Closes in 5 days🔔 Get alerts for bids like this