open🌐 San Francisco Airport (Construction)10071.76 - TP 246
Terminal 3 West Modernization - TP 246 - East: Sitework and Site Utilities
San Francisco Airport (Construction) / Design-Builder
Description
Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 735,000 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for o&ices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: 246 Trade Package Title: East: Sitework and Site Utilities Description of the Trade Package Scope of Work: This trade package includes sitework and site utility improvements within the east portion of the project area. The scope includes grading, excavation, trenching, backfill, paving, concrete flatwork, drainage improvements, and installation or modification of underground utilities, including coordination, testing, inspections, and restoration of disturbed areas. Trade Package Bid Due Date and Time: 8/10/2026 by 5:00PM Estimated Cost: $16.1 M Main Trades of the Trade Package: Sitework, Site Utilities CMD LBE Participation Requirements % : 25% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com
Details?
- Posted
- Jul 13, 2026
- Response deadline
- Aug 11, 2026, 12:00 AM UTC (28d)
- Status
- open
- Buyer
- San Francisco Airport (Construction)
- Department
- Design-Builder
- Jurisdiction
- San Francisco Airport (Construction)
- Reference #
- 10071.76 - TP 246
- Summary
- Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization
- Government Code
- sfoconstruction
- Government Organization City
- San Francisco
- Government Organization State
- CA
- Government Organization Website
- https://www.flysfo.com/construction
- Government Organization Zip Code
- 94128
- Government Organization Address1
- P.O. Box 8097
- Government Organization Country Code
- US
Finding similar opportunities…
This listing is a summary from San Francisco Airport (Construction)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.