GovBidAlerts
← My Opportunities
open🌐 RFPMart: Construction Architecture Interior Design Landscaping Other Related ...http://www.rfpmart.com/1196255-us-fed-robins-rapid-construction-ota-progressive-design-build-fiber-replacement.html

US-FED-00000399379 - Robins RAPID Construction OTA Progressive Design Build Fiber Replacement - Deadline November 20,2026

Description

FA8501–27–RAPID–CIRCUIT F1–170129–OTAUnder the RAPID Umbrella Framework: RAPID Progressive Design–Build to Replace Circuit F–01 from Fowler Substation UHHZ170129DescriptionThe Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a.The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F–01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F–01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes.This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a.PurposeThe purpose of this Area of Interest is to obtain commercially viable, safe, and schedule–credible solutions to design plans for and to perform the replacement of expired high–risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia.The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks.Project Background and Existing ConditionsCircuit F–01 has surpassed its operational lifecycle, creating a high–probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations.The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F–01 will remain in full operation during the entire duration of the project by back feeding with circuit ties.Project AreasPhase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open–book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO.Phase 2 (Final Design & Construction Execution)Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO.Project–Specific Objectives and PhasingReplace all 15kV, 500MCM cable throughout the distribution of circuit F–01 in its entirety ofmultiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas.OTA & RAPID Framework Approach

Details

Posted
Nov 8, 2026
Response deadline
Nov 20, 2026, 11:59 PM UTC (12d)
Status
open
Jurisdiction
RFPMart: Construction Architecture Interior Design Landscaping Other Related ...
Has Description
true
Item
US-FED-00000399379 - Robins RAPID Construction OTA Progressive Design Build Fiber Replacement - Deadline November 20,2026 FA8501–27–RAPID–CIRCUIT F1–170129–OTAUnder

Similar open opportunities

See opportunities like this one

GovBidAlerts matches this solicitation to similar open bids across 115,000+ open bids from 2,500+ sources. Create a free account to unlock them.

Create free accountno credit card required

This listing is a summary from RFPMart: Construction Architecture Interior Design Landscaping Other Related ...'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.