GovBidAlerts
← My Opportunities
IFBopen🌐 Illinois DOT057-66C06

Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length. (Grundy)

Illinois DOT

Description

Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length.

Details

Response deadline
Jun 12, 2026, 12:00 PM UTC
Type
IFB
Status
Active
Buyer
Illinois DOT
Jurisdiction
Illinois DOT
Location
IL
Reference #
057-66C06
Bulletin
Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective paveme
Counties
Grundy
Finding similar opportunities…

This listing is a summary from Illinois DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.