closed🌐 kgbak222586
2026 Point Higgins Elementary School Fuel Storage Tank Project
kgbak / Public Works
Description
The Ketchikan Gateway Borough is seeking the services of a qualified contractor to provide Design-Build services to replace the 10,000-gallon regulated Underground Storage Tank (UST) at Point Higgins Elementary School with a new Aboveground Storage Tank (AST), sized by the Engineer per NFPA 20 or other governing regulation. Work will include all design, permitting, removal, soils sampling, regulatory site closeout, acquisition of new AST, installation, cutting and capping of existing fuel fill lines, final connection to existing fuel fill lines at the day tank, and all labor, tools, equipment and appurtenances necessary to complete this project.
Details?
- Posted
- Jan 22, 2026
- Response deadline
- Feb 24, 2026, 11:00 PM UTC
- Status
- closed
- Buyer
- kgbak
- Department
- Public Works
- Jurisdiction
- kgbak
- Reference #
- 222586
- Summary
- <p>The Ketchikan Gateway Borough is seeking the services of a qualified contractor to provide Design-Build services to replace the 10,000-gallon regulated Underground Storage Tank (UST) at Point Higgi
- Is Paused
- false
- Template Title
- Request for Proposal (updated SR)
- Copy Count
- 0
- Government Organization City
- Ketchikan
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/e0559b36-3fba-4865-92bd-d33071064754_ketchicangatewayseal.jpg
- Government Organization Name
- Ketchikan Gateway Borough
- Government Organization State
- AK
- Government Organization Website
- http://www.borough.ketchikan.ak.us/
- Government Organization Zip Code
- 99901
- Government Organization Address1
- 1900 First Avenue, Suite 118
- Government Organization Timezone
- America/Anchorage
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Contact
(907)228-6637
Finding similar opportunities…
This listing is a summary from kgbak's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 222586,
"_slug": "kgbak",
"title": "2026 Point Higgins Elementary School Fuel Storage Tank Project",
"status": "closed",
"summary": "<p>The Ketchikan Gateway Borough is seeking the services of a qualified contractor to provide Design-Build services to replace the 10,000-gallon regulated Underground Storage Tank (UST) at Point Higgins Elementary School with a new Aboveground Storage Tank (AST), sized by the Engineer per NFPA 20 or other governing regulation. Work will include all design, permitting, removal, soils sampling, regulatory site closeout, acquisition of new AST, installation, cutting and capping of existing fuel fill lines, final connection to existing fuel fill lines at the day tank, and all labor, tools, equipment and appurtenances necessary to complete this project.</p>",
"isPaused": false,
"template": {
"title": "Request for Proposal (updated SR)"
},
"addendums": [
{
"id": 101047
},
{
"id": 102327
},
{
"id": 102505
},
{
"id": 103056
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2025-12-12T19:40:10.553Z",
"department": {
"id": 5565,
"name": "Public Works"
},
"government": {
"code": "kgbak",
"organization": {
"city": "Ketchikan",
"logo": "https://assets.procurement.opengov.com/logo-uploads/e0559b36-3fba-4865-92bd-d33071064754_ketchicangatewayseal.jpg",
"name": "Ketchikan Gateway Borough",
"phone": "(907)228-6637",
"state": "AK",
"website": "http://www.borough.ketchikan.ak.us/",
"zipCode": "99901",
"address1": "1900 First Avenue, Suite 118",
"address2": null,
"phoneExt": null,
"timezone": "America/Anchorage",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": null,
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2026-02-24T23:00:00.000Z",
"releaseProjectDate": "2026-01-22T09:00:00.000Z"
}