open🌐 United Kingdom (Contracts Finder)C4N121956709
Manchester International Airport Phase 2 - Overbridge Civils
Kier Transportation - CP7 NWC
Description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including: • Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections. • Modification of existing bridge cill. • Supply and installation of bridge bearing plates, including associated screed works. • Construction of pile caps/infill. • Placement of in-situ concrete shear key infill. • Construction of the reinforced concrete bridge deck slab. • Construction of reinforced concrete parapet walls. • Placement of in-situ concrete footpaths and fill areas. • Construction of pilasters, including reinforced concrete and brickwork elements. • Supply and installation of parapet and pilaster copings. • Construction of associated fencing, signage and PCC retaining wall. • Installation of associated ducting works. • Completion of highway works excluding final road surfacing. • Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works. • Construction of associated drainage works. Exclusions: Final road/footpath surfacing works are excluded from this scope.
Details?
- Posted
- Oct 23, 2026
- Response deadline
- Oct 30, 2026, 5:00 PM UTC (6d)
- Category
- works
- Status
- active
- Estimated value
- GBP 1,000,000
- Buyer
- Kier Transportation - CP7 NWC
- Jurisdiction
- United Kingdom (Contracts Finder)
- Start date
- Feb 27, 2027
- End date
- Jul 1, 2027
- Reference #
- C4N121956709
- Has Description
- true
- Country
- United Kingdom
- Tender Value Currency
- GBP
- Tender Min Value Amount
- 500000
- Tender Description
- The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. T
- Tender Classification Scheme
- CPV
- Tender Classification Description
- Surface work for highways
Contact
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 114,000+ open bids from 2,500+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from United Kingdom (Contracts Finder)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.