GovBidAlerts
← My Opportunities
open🌐 City of New Haven, CT2027-ITB-387

Alling Memorial Golf Course Renovation Project Holes # 1, 8, 9, 10, 18 & Putting Green

City of New Haven, CT / Parks

Description

ALLING GOLF COURSE City of New Haven, Connecticut Site Location: 35 Eastern St.. New Haven, CT 06513 Golf Course Drawings, Specifications, Bid Form & Details GOLF COURSE RENOVATION PROJECT Holes # 1, 8, 9, 10, 18 & Putting Green Prepared by Golf Design Unlimited, LLC Qualifications - for the project the Contractor must meet: The Contractor shall have golf course experience with a minimum of five years. The supervisor for this project must have the same experience. This project is a PREVAILING WAGE BID & involves the renovation of all sand bunkers on holes #1, 8, 9, 10 & 18 as well as the construction of a new putting green at the site of the existing/abandoned putting green. There will be a total of twelve (12) sand bunkers rebuilt. All the sand bunkers are being restored at/in their present locations. Additional drainage is indicated on certain holes (example #1). A new 4,000 s.f. putting green will be constructed (approx. 100’ x 52’). The new irrigation will tie into an existing line close by. It will not be a typical “USGA Specified Green” but a “California Green”. At each existing sand bunker minimal sod will be stripped then sand, bunker blankets (if found) and existing internal drainage will be removed. Sand bunkers will be rebuilt completely with new internal 4” perforated drainage being replaced and capillary concrete will be installed as the new base. The sand bunker designs are meant to work around all existing irrigation. All damage to irrigation equipment is the responsibility of the Contractor to fix. The average size sand bunker will be 1,150 s.f. with 100 l.f. of perforated pipe and two (2) catch basins included in the bunker price along with the capillary concrete and the cost & installation of the sand. The Contractor shall provide all material for the project including the drainage, sod, bunker sand, fill and additional topsoil. Payment shall be invoiced on an AIA Payment Certificate Form and based on the required project schedule of values. Specific milestones for completed work can be invoiced for review for processing for progress payments however each invoice shall apply a 5% retainage that will be released upon full completion of the project. All labor and materials will be at contractor’s expense – no upfront payments at start of job.

Details

Posted
Aug 10, 2026
Response deadline
Sep 2, 2026, 7:00 PM UTC (22d)
Status
open
Buyer
City of New Haven, CT
Department
Parks
Jurisdiction
City of New Haven, CT
Reference #
2027-ITB-387
Has Description
true
Summary
ALLING GOLF COURSE City of New Haven, Connecticut Site Location: 35 Eastern St.. New Haven, CT 06513 <img src="https://govlist.s3
Government Code
newhavenct
Government Organization City
New Haven
Government Organization State
CT
Government Organization Website
https://www.newhavenct.gov
Government Organization Zip Code
06510
Government Organization Address1
165 Church St
Government Organization Country Code
US
Other
Is Paused: false · Template Title: CNH Construction and Services · Copy Count: 0 · Government Organization Logo: https://assets.procurement.opengov.com/logo-uploads/721996f8-e441-428f-8446-fc4d4d683888_new_haven_c · Government Organization Timezone: America/New_York · Government Organization Phone Country: 1

Contact

(475)238-1323

Similar open opportunities

See opportunities like this one

GovBidAlerts matches this solicitation to similar open bids across 135,000+ open bids from 2,300+ sources. Create a free account to unlock them.

Create free accountno credit card required

This listing is a summary from City of New Haven, CT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.