Professional Servicesopen🌐 Florida DOT27373
SR 263 (CAPITAL CIR NW) FROM SR 8 TO US 27 (N MONROE ST)
Florida DOT — District Three
Description
2.0-Proj Development & Environmental (PD&E) Studies <br/> 3.2-Major Highway Design <br/> 4.2.1-Major Bridge Design - Concrete — Letter of Response and Oral Presentation
Details?
- Posted
- Jul 13, 2026
- Response deadline
- Jul 27, 2026, 5:00 PM UTC (13d)
- Type
- Professional Services
- Status
- open
- Estimated value
- $1,000,000
- Buyer
- Florida DOT — District Three
- Jurisdiction
- Florida DOT
- Award date
- Sep 21, 2026
- Reference #
- 27373
- Bdi
- No
- Ad Key
- 14776
- FMNumbers
- 45816612201
- Ad Date Month Date
- Jul 1, 2026
- Ad Public Row View
- C
- Ad Contract Amount
- 1000000
- Ad Status Type Name
- Current
- Number Of Contracts
- 1
- Major Work Types Text
- 2.0-Proj Development & Environmental (PD&E) Studies <br/> 3.2-Major Highway Design <br/> 4.2.1-Major Bridge Design - Concrete
- Minor Work Types Text
- 6.1-Traffic Engineering Studies <br/> 8.2-Design, Right of Way, Construction Surveying <br/> 8.3-Photogrammetric Mapping <br/> 9.1-Soil Exploration
- Selection Method Text
- Letter of Response and Oral Presentation
- Ad Status Procr Path Key
- 3
- Shortlist Selection Date
- Aug 17, 2026
- Dot Assigned District Code
- 03
- Ad Contract Match Detail Key
- 14987
- Project Threshold Type Name
- Technically Prequalified & Unlimited Audit required
Finding similar opportunities…
This listing is a summary from Florida DOT's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.