closed🌐 myclearwater25-0027-UT
25-0027-UT Water, Reclaimed Water and Well Repair & Improvements
myclearwater / Public Utilities
Description
The intent of this bid is to obtain competitive prices to establish an annual contract for on-call (as-needed) services for water and reclaimed water infrastructure repairs and improvements (Group A), on-call (as-needed) services for water and reclaimed water trenchless pipeline installations (Group B), on-call asphalt replacement (Group C), on-call concrete replacement (Group D), and on-call well maintenance (Group E). Bidders may bid on one or all Groups. The City of Clearwater owns and operates 44 groundwater wells that are the primary source of raw water treated by the City’s three water treatment plants. The City of Clearwater also owns, operates, and maintains 586 miles of potable water main and 140 miles of reclaimed water mains. The work that may be included as part of this Contract may include but is not limited to: Group A : Point repairs, pipe installation/replacement (with various different installation methods), valve installation/replacement, service line installation, hydrant installation, etc. Group B : Trenchless pipeline installation/replacement including but not limited to horizontal directional drill, pipebursting, and jack and bore. Group C : Asphalt replacements following public utility point repairs and/or associated maintenance activities. Group D : Concrete replacement following public utility point repairs and/or associated maintenance activities. Group E : Well maintenance including all pump removal and replacement, well refurbishment through acidification, well evaluations and mechanical integrity testing of the City’s injection well. Specific work for this contract will be at the request of the City by a work order request. All quantities are estimates only and the city of Clearwater (city) is not obligated to purchase any minimum or maximum amount during the life of the contract. All the work is to be administered per Section III, Section 11.3, Unit Price Work, of the Contract Documents. The city reserves the right to increase funds during the contract term if work exceeds original estimates, subject to required authorizations. Beyond the initial one-year term, the city reserves the right to renew the contract for up to three (3) years. The successful contractor will be required to enter into a contract with the City of Clearwater and provide all labor, equipment, and materials for water and reclaimed water infrastructure improvements and repairs. The City has an expectation as part of this contract that the successful contractor(s) will mobilize in an expedited manner during emergencies in order to minimize water and reclaimed water outages for City residents. The City shall define what constitutes as an emergency. For emergency repairs, estimates shall be provided by the contractor within 6 hours and mobilization shall occur within 12 hours. Mobilization, whether nonemergency or emergency, shall be per work order request as defined by the City. Each work order may include more than one individual project. The various items shall be performed in accordance with City of Clearwater specifications and in conformity with the existing condition of the pipe, its grade, and dimensions. All work shall be completed in accordance with the City of Clearwater Construction Standard Details, unless otherwise directed. Products, materials, dimensions specified in this section (IV) and preferred products list shall supersede those products, materials, and dimension called out in the City of Clearwater Construction Standard Details. The Contract will be on the basis of materials and equipment specified or described in the bidding documents. The materials and equipment described herein establish a standard of required type, function, and quality. No item of material or equipment will be considered by the Engineer and/or City as an “or-equal” item unless written request for approval has been submitted by the Bidder and has been received by the City at least 15 days prior to the date for receipt of Bids. Each request shall conform to the requirements of the General Conditions. The City’s decision of approval or disapproval of a proposed item will be final. Warranty for all work conducted under this contract shall be one (1) year for labor. Materials shall comply with the individual products installed. The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County in the bid response. The Contractor shall provide Fixed and Portable project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.
Details?
- Posted
- Aug 20, 2025
- Response deadline
- Sep 30, 2025, 6:00 PM UTC
- Status
- closed
- Buyer
- myclearwater
- Department
- Public Utilities
- Jurisdiction
- myclearwater
- Reference #
- 25-0027-UT
- Summary
- <p style="text-align: justify; margin: 0in; font-size: 12pt;"><span style="font-size: 11.0pt; color: black;">The intent of this bid is to obtain competitive prices to establish an annual contract for
- Is Paused
- false
- Template Title
- Construction Bid
- Copy Count
- 0
- Government Organization City
- Clearwater
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/fcf43a5e-fefc-43a8-8466-c79f5ac65c9f_TinyTake03-06-2024-08-22-53.png
- Government Organization Name
- City of Clearwater
- Government Organization State
- FL
- Government Organization Website
- www.myclearwater.com
- Government Organization Zip Code
- 33756
- Government Organization Address1
- 100 South Myrtle Avenue
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Closed Substatus
- awarded
Contact
(727)562-4842
Finding similar opportunities…
This listing is a summary from myclearwater's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 189741,
"_slug": "myclearwater",
"title": "25-0027-UT Water, Reclaimed Water and Well Repair & Improvements",
"status": "closed",
"summary": "<p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The intent of this bid is to obtain competitive prices to establish an annual contract for on-call (as-needed) services for <strong>water and reclaimed water infrastructure repairs and improvements</strong> (Group A), on-call (as-needed) services for <strong>water and reclaimed water trenchless pipeline installations</strong> (Group B), on-call <strong>asphalt replacement</strong> (Group C), on-call <strong>concrete replacement</strong> (Group D), and on-call <strong>well maintenance</strong> (Group E). Bidders may bid on one or all Groups. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The City of Clearwater owns and operates 44 groundwater wells that are the primary source of raw water treated by the City’s three water treatment plants. The City of Clearwater also owns, operates, and maintains 586 miles of potable water main and 140 miles of reclaimed water mains. The work that may be included as part of this Contract may include but is not limited to: </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><u><span style=\"font-size: 11.0pt; color: black;\">Group A</span></u><span style=\"font-size: 11.0pt; color: black;\">: Point repairs, pipe installation/replacement (with various different installation methods), valve installation/replacement, service line installation, hydrant installation, etc. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><u><span style=\"font-size: 11.0pt; color: black;\">Group B</span></u><span style=\"font-size: 11.0pt; color: black;\">: Trenchless pipeline installation/replacement including but not limited to horizontal directional drill, pipebursting, and jack and bore. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><u><span style=\"font-size: 11.0pt; color: black;\">Group C</span></u><span style=\"font-size: 11.0pt; color: black;\">: Asphalt replacements following public utility point repairs and/or associated maintenance activities. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><u><span style=\"font-size: 11.0pt; color: black;\">Group D</span></u><span style=\"font-size: 11.0pt; color: black;\">: Concrete replacement following public utility point repairs and/or associated maintenance activities. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><u><span style=\"font-size: 11.0pt; color: black;\">Group E</span></u><span style=\"font-size: 11.0pt; color: black;\">: Well maintenance including all pump removal and replacement, well refurbishment through acidification, well evaluations and mechanical integrity testing of the City’s injection well. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">Specific work for this contract will be at the request of the City by a work order request. All quantities are estimates only and the city of Clearwater (city) is not obligated to purchase any minimum or maximum amount during the life of the contract. All the work is to be administered per Section III, Section 11.3, Unit Price Work, of the Contract Documents. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The city reserves the right to increase funds during the contract term if work exceeds original estimates, subject to required authorizations. Beyond the initial one-year term, the city reserves the right to renew the contract for up to three (3) years. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The successful contractor will be required to enter into a contract with the City of Clearwater and provide all labor, equipment, and materials for water and reclaimed water infrastructure improvements and repairs. The City has an expectation as part of this contract that the successful contractor(s) will mobilize in an expedited manner during emergencies in order to minimize water and reclaimed water outages for City residents. The City shall define what constitutes as an emergency. For emergency repairs, estimates shall be provided by the contractor within 6 hours and mobilization shall occur within 12 hours. Mobilization, whether nonemergency or emergency, shall be per work order request as defined by the City. Each work order may include more than one individual project. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The various items shall be performed in accordance with City of Clearwater specifications and in conformity with the existing condition of the pipe, its grade, and dimensions. All work shall be completed in accordance with the City of Clearwater Construction Standard Details, unless otherwise directed. Products, materials, dimensions specified in this section (IV) and preferred products list shall supersede those products, materials, and dimension called out in the City of Clearwater Construction Standard Details. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The Contract will be on the basis of materials and equipment specified or described in the bidding documents. The materials and equipment described herein establish a standard of required type, function, and quality. No item of material or equipment will be considered by the Engineer and/or City as an “or-equal” item unless written request for approval has been submitted by the Bidder and has been received by the City at least 15 days prior to the date for receipt of Bids. Each request shall conform to the requirements of the General Conditions. The City’s decision of approval or disapproval of a proposed item will be final. Warranty for all work conducted under this contract shall be one (1) year for labor. Materials shall comply with the individual products installed. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County in the bid response. </span></p><p style=\"text-align: justify; margin: 0in; font-size: 12pt;\"><span style=\"font-size: 11.0pt; color: black;\">The Contractor shall provide Fixed and Portable project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work. </span></p>",
"isPaused": false,
"template": {
"title": "Construction Bid"
},
"addendums": [
{
"id": 86248
},
{
"id": 88523
},
{
"id": 88555
},
{
"id": 89070
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2025-08-07T15:07:33.157Z",
"department": {
"id": 8233,
"name": "Public Utilities"
},
"government": {
"code": "myclearwater",
"organization": {
"city": "Clearwater",
"logo": "https://assets.procurement.opengov.com/logo-uploads/fcf43a5e-fefc-43a8-8466-c79f5ac65c9f_TinyTake03-06-2024-08-22-53.png",
"name": "City of Clearwater",
"phone": "(727)562-4842",
"state": "FL",
"website": "www.myclearwater.com",
"zipCode": "33756",
"address1": "100 South Myrtle Avenue",
"address2": null,
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "25-0027-UT",
"closeOutReason": null,
"closedSubstatus": "awarded",
"proposalDeadline": "2025-09-30T18:00:57.286Z",
"releaseProjectDate": "2025-08-20T15:13:57.297Z"
}