open🌐 Texas (ESBD)754-TXST-2027-CSP-515-PDC
Supple Science Roof Replacement-2027
754
Description
· Re-roofing of an existing science building. This project will consist of two phases. Phase I will be the completion of the main roof replacement, which directly impacts the building’s laboratory ventilation system. Contractor acknowledges that Texas State University laboratory classes will resume immediately following the winter break. Uninterrupted operation of the laboratory ventilation system is a strict requirement for student occupancy, academic instruction, and safety compliance. Phase II will consist of adjacent roofs which do not have a ventilation system. A Critical Path Method Schedule must be submitted detailing ventilation system coordination, weather contingencies, material procurement lead times, as well as clearly identifying all milestones that must be met in Phase I demonstrating how the winter break deadline will be successfully achieved.
Documents (1)?
- Download📎 media.nlapplication/pdf · 101 KB
Details?
- Posted
- Sep 14, 2026
- Response deadline
- Oct 6, 2026, 11:59 PM UTC (19d)
- Status
- open
- Buyer
- 754
- Jurisdiction
- Texas (ESBD)
- Reference #
- 754-TXST-2027-CSP-515-PDC
- Has Description
- true
- Source Status
- Posted
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 118,000+ open bids from 2,400+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from Texas (ESBD)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.