RFPopen🌐 Alberta (APC)AB-2026-06190
ENGINEERING CONSULTANT SERVICES Wastewater Upgrades Planning – Boulton Creek and Fortress Junction PETER LOUGHEED PROVINCIAL PARK
Forestry and Parks
Description
Scope/Description: .1 Perform Wastewater Upgrades Planning services at Boulton Creek and Fortress Junction within Peter Lougheed Provincial Park. .2 The project scope includes assessing existing wastewater infrastructure and developing conceptual designs for capital upgrades at Boulton Creek and Fortress Junction within Peter Lougheed Provincial Park. The work includes infrastructure condition assessments, feasibility studies, options analysis, geotechnical investigations, cost estimates, and prioritization of recommended upgrades. .3 The assessment will include the wastewater systems serving the Boulton Creek full-service campground, comfort station, maintenance shop area, dump station, camper's store (Trading Post), and the Fortress Junction service station and staff residence. Existing treatment and disposal systems will be evaluated with consideration for seasonal operation, winterization requirements, system capacity, and long-term operation. .4 The project will evaluate aging wastewater infrastructure that has reached the end of its operational life and requires significant upgrades, replacement, and/or modernization. The assessment will consider current operational challenges, including high-strength wastewater generated from the Boulton Creek dump station and serviced campground facilities. .5 The wastewater infrastructure assessment and planning process will inform a conceptual design for future capital upgrades. .6 Work under this contract includes all components identified in the RFP. .7 Project Key Locations: Peter Lougheed Provincial Park (Boulton Creek Area) (50.634857, -115.108322), Kananaskis, AB, Google Map Link in document Peter Lougheed Provincial Park (Fortress Junction Area) (50.634857, -115.108322), Kananaskis, AB, Google Map Link in document ANTICIPATED PROJECT SCHEDULE .1 The project schedule calls for commencement of Contract by October 19, 2026 and completion of Services by March 12, 2027.
Details?
- Posted
- Sep 8, 2026
- Response deadline
- Sep 29, 2026, 8:00 PM UTC (14d)
- Type
- RFP
- Category
- SRV
- Status
- open
- Buyer
- Forestry and Parks
- Jurisdiction
- Alberta (APC)
- Location
- Alberta
- Reference #
- AB-2026-06190
- Has Description
- true
- Status Order
- 2
- @Search Score
- 1
- Commodity Codes
- 80160000, 80161500, 81100000, 81101508
- Agreement Type Code
- TA-01
- Ai Version Keywords
- wastewater upgrades, engineering consultant services, infrastructure assessment, capital upgrades, conceptual design, feasibility study, geotechnical investigations, cost estimates, wastewater infrast
- Submission Details
- Please refer to the RFP for submission details.
- Project Description
- Scope/Description: .1 Perform Wastewater Upgrades Planning services at Boulton Creek and Fortress Junction within Peter Lougheed Provincial Park. .2 The project scope includes assessing existing waste
- Solicitation Number
- 27PAR8027
- Commodity Code Titles
- Business administration services, Management support services, Professional engineering services, Architectural engineering
- Opportunity Type Code
- OPEN-COMPETITIVE
- Question Submission Details
- Inquiries Contact: Nicola Whelan-Henderson Email Address: nicola.whelan-henderson@gov.ab.ca
Similar open opportunities
See opportunities like this one
GovBidAlerts matches this solicitation to similar open bids across 120,000+ open bids from 2,400+ sources. Create a free account to unlock them.
Create free accountno credit card required
This listing is a summary from Alberta (APC)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.