GovBidAlerts
← My Opportunities
open🌐 RFPMart: Construction Architecture Interior Design Landscaping Other Related ...http://www.rfpmart.com/1178304-us-fed-market-survey-design-and-construction-of-prefabricated-metal-storage-garage---boise-air-traffic-control-tower-gowen-field-bo.html

US-FED-00000395381 - Market Survey: Design and Construction of Prefabricated Metal Storage Garage - Boise Air Traffic Control Tower (Gowen Field), Bo - Deadline October 14,2026

Description

1. IntroductionTo support acquisition strategy development and assess commercial marketplace capabilities, the Federal Aviation Administration (FAA) is seeking interested sources capable of designing and constructing a finished pre–engineered metal storage garage at the Boise Air Traffic Control Tower (ATCT). This Market Survey is issued in accordance with FAA Acquisition Management System (AMS) Policy 3.2.1.2.1 to solicit statements of interest and capabilities.Estimated Project Value Range: $450,000.00 – $650,000.00Place of Performance: Boise Air Traffic Control Tower (ATCT) / Gowen Field2901 Ed Stimpson Way, Boise, ID 836422. Project Description & Scope of WorkThe Federal Aviation Administration (FAA), Mobile Asset Program, has a requirement to design and construct a finished pre–engineered metal storage garage (PEMB) at the Boise Air Traffic Control Tower (Gowen Field). The new facility will serve as an unstaffed equipment storage building to house and protect large mobile equipment trailers. Specific work items and technical parameters include:Building Structure & Dimensions: Design, fabricate, deliver, and erect a 53`–0“ W x 90`–0“ L x 18`–0“ Eave Height (5,208 sq. ft.) gable Pre–Engineered Metal Building (PEMB) capable of meeting 2018 International Building Code (IBC) standards and 115 mph wind speeds (Exposure C). Floor–to–ceiling interior clearance shall be not less than 14 feet above the floor slab.Slab & Substructure Foundation: Utilize the existing 53` x 90` concrete slab/ramp as the finished floor. Clean, pressure wash, and apply a high–grade clear penetrating concrete sealer (epoxy not required). Construct a new reinforced concrete perimeter foundation outside the footprint of the existing slab, consisting of 20 augered cylindrical piers (30“ diameter x 6`–0“ deep) spaced at 10`–0“ O.C., a 3`–0“ high perimeter concrete skirt/stem wall, and 4“ concrete infill between the existing curb and new skirt wall.Building Access & Overhead Doors: Furnish and install two (2) 16`–2“ W x 14`–1“ H commercial insulated sectional roll–up doors (R–12.76 rating) on the east (53`) facade with manual chain hoists, designed to accommodate large mobile asset trailers. Provide two (2) interior manual chain hoists for equipment handling. Install two (2) 3`–0“ x 7`–0“ hollow metal personnel egress doors with panic hardware (one on the east face between the roll–up doors, and one on the south face).Thermal Envelope & Environmental Controls: Install full R–11 roof and wall blanket insulation with white/reflective foil vapor retarder facing. Equip the facility with interior unit heating for freeze protection, passive/active exhaust ventilation fans with automated louvers, and complete perimeter joint caulking and elastomeric weather sealing.Electrical & Exterior Lighting: Install commercial LED exterior wall–pack luminaires above bay openings and access doors, connected to the adjacent facility overhead/underground electrical power feed.Civil & Asphalt Paving Work: Design and construct heavy–duty asphalt paving adjacent to the east bay doors to facilitate heavy trailer maneuvering into storage bays. Grade earthwork around the perimeter skirt wall for positive surface drainage away from the structure. Implement SWPPP measures during construction. (Sub–surface drainage piping, domestic water, and plumbing are explicitly excluded).The anticipated performance schedule is ninety (90) calendar days / twelve (12) weeks from the issuance of the official Notice to Proceed (NTP). The award will be made under a firm–fixed–price (FFP) contract structure.3. DisclaimerThis announcement is a Market Survey only and does not constitute a Screening Information Request (SIR) or Request for Proposal (RFP). The Federal Aviation Administration (FAA) is neither seeking nor accepting unsolicited proposals.Responses to this Market Survey will be used to evaluate industry capabilities and may be used to establish a qualified vendors list for this procurement. Therefore, it is imperative that all interested companies submit all requested information. Companies that fail to provide the required documentation will not be considered further. This announcement shall not be construed as a commitment or promise by the Government to award a contract. The Government is not responsible for, nor will it reimburse, any costs incurred in the preparation or submission of responses. All submitted materials become Government property and will not be returned.4. Capability Statement & Submission RequirementsInterested Small Business prime contractors holding an active SAM.gov registration under NAICS 236220 or 236210 are invited to submit a Capability Statement demonstrating experience with similar federal aviation or industrial Pre–Engineered Metal Building (PEMB) projects. Submissions must include:Company Profile: CAGE Code, Unique Entity ID (UEI), and applicable socio–economic certification documentation (e.g., 8(a), HUBZone, WOSB/EDWOSB, SDV

Details

Posted
Sep 26, 2026
Response deadline
Oct 14, 2026, 11:59 PM UTC (18d)
Status
open
Jurisdiction
RFPMart: Construction Architecture Interior Design Landscaping Other Related ...
Has Description
true
Item
US-FED-00000395381 - Market Survey: Design and Construction of Prefabricated Metal Storage Garage - Boise Air Traffic Control Tower (Gowen Field), Bo - Deadline October 14,2026 <

Similar open opportunities

See opportunities like this one

GovBidAlerts matches this solicitation to similar open bids across 112,000+ open bids from 2,500+ sources. Create a free account to unlock them.

Create free accountno credit card required

This listing is a summary from RFPMart: Construction Architecture Interior Design Landscaping Other Related ...'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.