GovBidAlerts
OpenInternational

Manchester International Airport Phase 2 - Platform Civils

Kier Transportation - CP7 NWC

Due Closes in 10 daysRef. C4N123805978

At a glance

What

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.

Category: works

Where
United Kingdom
Key dates
  • Posted: Nov 23, 2026
  • Deadline: Fri, Dec 4, 2026 · 5:00 PM UTC (closes in 10 days)
How to respond

Mark Thompson · mark.thompson@kier.co.uk · 07895307597

Submit through OCDS ↗ · how to bid

Documents
None attached here — see the source portal

Description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study.
Read more ↓
Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the platform civils work at Manchester Airport Station. • Platform demolition • Asset recoveries • Track walkway/crossings • UTX • Troughing • Riser wall foundations • New riser walls (blockwork and PCC) • Copers (including realignment) • Tactile paving • Drainage (ACO's and carrier) • Ducting • Equipment foundations (in-situ and PCC) • Waiting shelter foundations • Platform furniture • SME works (end of platform ramps) • Fencing/Gate works • Block paving/surfacing • Associated reinstatement works
All notice detailsShow ↓
Posted
Nov 23, 2026
Category
works
Status
active
Estimated value
GBP 2,500,000
Jurisdiction
United Kingdom (Contracts Finder)
Start date
Jul 26, 2027
End date
Sep 27, 2027
Reference #
C4N123805978
Country
United Kingdom
Tender Value Currency
GBP
Tender Min Value Amount
1000000
Tender Description
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.
Tender Classification Scheme
CPV
Tender Classification Description
Drainage works
Tender Suitability Vcse
No
Initiation Type
tender

This listing is a summary from United Kingdom (Contracts Finder)'s open procurement data. The full solicitation documents are on the source portal.