IFBclosed🌐 Virginia (eVA)IFB B#10-03
Herndon: Construction of Asphalt Concrete Paving & Milling
Other eVA Localities
Description
The contract shall include, but not be limited to, milling of existing asphalt; asphalt paving including surface preparation, tack coat, installation of manhole riser rings, manually adjusting water valve boxes, traffic control, resident notification, restoration and removal of debris upon completion of work in the Town of Herndon. A FIVE PERCENT (5%) BID BOND IS REQUIRED: 100 PERCENT (100%) PAYMENT AND PERFORMANCE BOND IS REQUIRED FROM THE SUCCESSFUL BIDDER.
Details?
- Posted
- Mar 17, 2010
- Response deadline
- Mar 24, 2010, 2:00 PM UTC
- Type
- IFB
- Category
- Construction
- Status
- closed
- Buyer
- Other eVA Localities
- Jurisdiction
- Virginia (eVA)
- Location
- Town of Herndon, Herndon, Virginia.
- Reference #
- IFB B#10-03
- App
- VBO
- Agency
- S000
- Doctype
- SO
- Version
- 2
- Commcode
- 91200
- Commdesc
- Construction Services, General
- Longdesc
- The contract shall include, but not be limited to, milling of existing asphalt; asphalt paving including surface preparation, tack coat, installation of manhole riser rings, manually adjusting water v
- Doccddesc
- Invitation for Bids (IFB)
- Commlinedesc
- []
- Lastupdatedate
- Oct 13, 2018
Contact
Mary Beavers
Finding similar opportunities…
This listing is a summary from Virginia (eVA)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": "VBO:IFB:S000:62154",
"app": "VBO",
"doccd": "IFB",
"agency": "S000",
"status": "Closed",
"doctype": "SO",
"pubdate": "2010-03-17T14:30:00Z",
"version": "2",
"workloc": "Town of Herndon, Herndon, Virginia.",
"category": "Construction",
"commcode": [
"91200"
],
"commdesc": [
"Construction Services, General"
],
"longdesc": "The contract shall include, but not be limited to, milling of existing asphalt; asphalt paving including surface preparation, tack coat, installation of manhole riser rings, manually adjusting water valve boxes, traffic control, resident notification, restoration and removal of debris upon completion of work in the Town of Herndon. A FIVE PERCENT (5%) BID BOND IS REQUIRED: 100 PERCENT (100%) PAYMENT AND PERFORMANCE BOND IS REQUIRED FROM THE SUCCESSFUL BIDDER.",
"_version_": 1747861006587003000,
"amenddate": "2010-03-17T00:00:00Z",
"buyername": "Mary Beavers",
"closedate": "2010-03-24T14:00:00Z",
"doccddesc": "Invitation for Bids (IFB)",
"docdeptcd": "S000",
"shortdesc": "Herndon: Construction of Asphalt Concrete Paving & Milling",
"agencyname": "Other eVA Localities",
"externalid": "IFB B#10-03",
"internalid": "62154",
"commlinedesc": [
"[]"
],
"lastupdatedate": "2018-10-13T03:05:37Z",
"categoryshortdesc": "Construction",
"openresponsesdate": "2010-03-24T14:00:00Z"
}