This project includes the environmental remediation of 198 River Street and associated limited site improvements at 194, 198, and 200 River Street to support the redevelopment of 198 River Street by a private developer. The project will consist of four distinct phases. Phases 1, 2, and 4 will be completed under this contract by the City's selected contractor. Phase 3 will be completed by the private developer and may require temporary demobilization of the City's contractor while the private developer completes the Phase 3 work. The anticipated construction duration for Phases 1 and 2 is 84 calendar days. The duration of Phase 3, by the private developer, is anticipated to be 30 days. The duration of Phase 4 of the project is anticipated to be 60 calendar days. Phase 1 (remediation) includes the demolition and disposal of polychlorinated biphenyl (PCB) contaminated concrete slabs at 194 and 198 River Street; excavation and disposal of contaminated soils (PCBs greater than 50 ppm and other contaminants) from three remedial excavation areas at 198 River Street; along with dewatering, treatment, and discharge of contaminated groundwater to the sanitary sewer to complete the excavation of one of the remedial excavations. Phase 2 includes installation of temporary support of excavation along River Street, excavation for the foundation of the proposed building, construction of a retaining wall, and backfilling and compaction of the site to grades specified to prepare the site for Phase 3. Phase 3 will be completed by the private developer and consists of construction of the proposed building foundation (footings and foundation walls). Phase 4 includes finalizing the temporary support of excavation, backfilling and compaction of the site to final subgrades for construction of the paved parking areas at 194, 198, and 200 River Street, installation of an on-site stormwater drainage system at 194 and 198 River Street, installation of underground electrical service and light poles at 194 and 198 River Street, installation of tree pits at 198 River Street and along River Steet itself, installation of the bituminous binder course at 198 River Street, and repair of the existing sidewalk and curb along River Street and pavement in the roadway of River Street after installation of service laterals (sanitary sewer, water, and natural gas). This project is funded, in part, by a grant from the State of Connecticut. The contractor who is selected to perform this State funded project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the spending allocation goals. Bidders shall review the State of Connecticut Department of Economic and Community Development (DECD) Bidding, Contracting, & Procurement for Construction Guidelines for DECD Programs, January 2026 revision, which are included as an attachment to the bid documents, and become familiar with all applicable DECD bidding requirements. An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply. This contract is subject to state spending allocation goals and contract compliance requirements.
Details?
- Posted
- Mar 16, 2026
- Response deadline
- May 6, 2026, 7:00 PM UTC
- Status
- closed
- Buyer
- newhavenct
- Department
- Economic Development Administration
- Jurisdiction
- newhavenct
- Reference #
- 2026-IFB-310
- Summary
- <p>This project includes the environmental remediation of 198 River Street and associated limited site improvements at 194, 198, and 200 River Street to support the redevelopment of 198 River Street b
- Is Paused
- false
- Template Title
- CNH Construction & Service
- Copy Count
- 0
- Government Organization City
- New Haven
- Government Organization Logo
- https://assets.procurement.opengov.com/logo-uploads/721996f8-e441-428f-8446-fc4d4d683888_new_haven_ct.jfif
- Government Organization Name
- City of New Haven, CT
- Government Organization State
- CT
- Government Organization Website
- https://www.newhavenct.gov
- Government Organization Zip Code
- 06510
- Government Organization Address1
- 165 Church St
- Government Organization Timezone
- America/New_York
- Government Organization Country Code
- US
- Government Organization Phone Country
- 1
- Close Out Reason
- No award will be made , bid responses exceed budgeted allocation
- Closed Substatus
- canceled
Contact
(475)238-1323
Finding similar opportunities…
This listing is a summary from newhavenct's open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.
Raw record
{
"id": 210968,
"_slug": "newhavenct",
"title": "Environmental Remediation of the City-Owned Property at 198 River Street and Associated Site Improvements",
"status": "closed",
"summary": "<p>This project includes the environmental remediation of 198 River Street and associated limited site improvements at 194, 198, and 200 River Street to support the redevelopment of 198 River Street by a private developer. The project will consist of four distinct phases. Phases 1, 2, and 4 will be completed under this contract by the City's selected contractor. Phase 3 will be completed by the private developer and may require temporary demobilization of the City's contractor while the private developer completes the Phase 3 work. The anticipated construction duration for Phases 1 and 2 is 84 calendar days. The duration of Phase 3, by the private developer, is anticipated to be 30 days. The duration of Phase 4 of the project is anticipated to be 60 calendar days.</p><p>Phase 1 (remediation) includes the demolition and disposal of polychlorinated biphenyl (PCB) contaminated concrete slabs at 194 and 198 River Street; excavation and disposal of contaminated soils (PCBs greater than 50 ppm and other contaminants) from three remedial excavation areas at 198 River Street; along with dewatering, treatment, and discharge of contaminated groundwater to the sanitary sewer to complete the excavation of one of the remedial excavations. Phase 2 includes installation of temporary support of excavation along River Street, excavation for the foundation of the proposed building, construction of a retaining wall, and backfilling and compaction of the site to grades specified to prepare the site for Phase 3. Phase 3 will be completed by the private developer and consists of construction of the proposed building foundation (footings and foundation walls). Phase 4 includes finalizing the temporary support of excavation, backfilling and compaction of the site to final subgrades for construction of the paved parking areas at 194, 198, and 200 River Street, installation of an on-site stormwater drainage system at 194 and 198 River Street, installation of underground electrical service and light poles at 194 and 198 River Street, installation of tree pits at 198 River Street and along River Steet itself, installation of the bituminous binder course at 198 River Street, and repair of the existing sidewalk and curb along River Street and pavement in the roadway of River Street after installation of service laterals (sanitary sewer, water, and natural gas).</p><p>This project is funded, in part, by a grant from the State of Connecticut. The contractor who is selected to perform this State funded project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the spending allocation goals. Bidders shall review the State of Connecticut Department of Economic and Community Development (DECD) Bidding, Contracting, & Procurement for Construction Guidelines for DECD Programs, January 2026 revision, which are included as an attachment to the bid documents, and become familiar with all applicable DECD bidding requirements.</p><p>An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply. This contract is subject to state spending allocation goals and contract compliance requirements.</p>",
"isPaused": false,
"template": {
"title": "CNH Construction & Service"
},
"addendums": [
{
"id": 111741
},
{
"id": 112657
},
{
"id": 110888
},
{
"id": 112312
},
{
"id": 109512
},
{
"id": 109692
}
],
"copyCount": 0,
"isPrivate": false,
"comingSoon": false,
"created_at": "2025-10-27T16:50:44.549Z",
"department": {
"id": 6456,
"name": "Economic Development Administration"
},
"government": {
"code": "newhavenct",
"organization": {
"city": "New Haven",
"logo": "https://assets.procurement.opengov.com/logo-uploads/721996f8-e441-428f-8446-fc4d4d683888_new_haven_ct.jfif",
"name": "City of New Haven, CT",
"phone": "(475)238-1323",
"state": "CT",
"website": "https://www.newhavenct.gov",
"zipCode": "06510",
"address1": "165 Church St",
"address2": null,
"phoneExt": null,
"timezone": "America/New_York",
"countryCode": "US",
"phoneCountry": "1"
}
},
"financialId": "2026-IFB-310",
"closeOutReason": "No award will be made , bid responses exceed budgeted allocation",
"closedSubstatus": "canceled",
"proposalDeadline": "2026-05-06T19:00:00.000Z",
"releaseProjectDate": "2026-03-16T04:00:00.000Z"
}